Virtual Interactive Construction Education

Virtual Interactive Construction Education. A Project-based Pedagogical Model for Construction Engineering and Management. University of Nebraska-Lincoln College of Engineering James D. Goedert Saeed Rokooei University of Nebraska Medical Center Munroe-Meyer Institute Robert Pawloski.

maisie
Télécharger la présentation

Virtual Interactive Construction Education

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Virtual Interactive Construction Education A Project-based Pedagogical Model for Construction Engineering and Management

  2. University of Nebraska-LincolnCollege of EngineeringJames D. GoedertSaeedRokooeiUniversity of NebraskaMedical CenterMunroe-Meyer InstituteRobert Pawloski

  3. PROJECT OBJECTIVES Develop VICE module for a single span bridge project Develop and implement an assessment methodology and tools to determine the effectiveness of the VICE bridge module on student learning. Disseminate materials, practices and results of this project

  4. Methodology • Formative • Qualitative measurement • Summative • Retrospective Post-then-Pre Questions adapted from Student Assessment of Learning Gains (SALG)

  5. Self Reported Learning gains • Did you realize before doing the simulation that a temporary bridge would be in order? • What elements of the simulation helped you learn best? • Did you use the “Ask a Consultant?” What did you learn from this resource? • Rate your ability to manage a single span bridge project… • After the simulation: 1 2 3 4 5 • Before the simulation: 1 2 3 4 5

  6. Initial Results • Sept 2011, Advisory Committee provided useful feedback • Pilot assessment early April • Review results with Advisory Committee in early May

  7. Questions???