1 / 10

Status of RF Group HZB (former BESSY)

Status of RF Group HZB (former BESSY). Wolfgang Anders. Outline: BESSY + HMI = HZB Low level Klystrons ~ 80.000 h HV part burned IOT instabilities RF leakage on klystron. Outline. HMI + BESSY = HZB. Berlin. HZB.

Télécharger la présentation

Status of RF Group HZB (former BESSY)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of RF Group HZB (former BESSY) Wolfgang Anders

  2. Outline: BESSY + HMI = HZB Low level Klystrons ~ 80.000 h HV part burned IOT instabilities RF leakage on klystron Outline

  3. HMI + BESSY = HZB Berlin

  4. HZB

  5. Low α optic, tera hertz radiation and infrared users are limited by the noise of the transmitters. We are now evaluating, if we need new low level system New master clock R&S SMA 100A with frequency resolution of 0.01 Hz for more precise horizontal orbit correction Noise at master clock ~ 70 fs  after 200 m cable ~ 500 fs Low level

  6. 80.000 h klystrons 3 of 4 klystrons at BESSY II have operating time of ~ 80.000 h now Coaxial switch at the 75 kW RF line To be prepared in case of problems, we install a high power coaxial switch with load at each transmitter.

  7. HV PS defekts Broken brass rod at HV transformator Burned part in HV PS

  8. IOT instabilities • Last year I reported on IOT phase/amplitude instabilities on E2V and CPI IOT • Planned measurements for near future: • Measurements at Thales IOT 1.3 GHz • Repeat measurements after 1 year of operation on CPI 80 kW 500 MHz IOT at MLS • Mesurements on CPI klystron

  9. Curios: energy saving lamp RF leakage at 10 kW 1.3 GHz klystron  Operating a neon lamp „without energy“ at RF field of 15 V/m in air .

  10. Thank You

More Related