An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Damage Illustrations

  2. Approach

  3. Figure 14: Moderate Damage - Approach Slab Settlement at the Abutment. Note the cracking of the concrete barrier as well.

  4. Figure 15: Moderate to Major Damage - Approach Settlement After Northridge

  5. Figure 16: Moderate to Major Damage – Settlement of Bridge Approach

  6. Figure 56: Settlement at the bridge approach, likely caused by soil settlement around the abutment (Northridge EQ)

  7. Approach: Minor Settlement

  8. Figure 15: Minor Damage – Parapet Crushing / Spalling

  9. Figure 60: Moderate Damage: Transverse Movement of the Abutment Wingwall

  10. Settlement at Approach; Spalling

  11. Minor cracking of curb 100_8779

  12. Serious erosion behind wingwall 100_8783

  13. superstructure

  14. Figure 57: Moderate Damage – Bowing of Parapet and Handrail

  15. Figure 58: Misalignment of curb line and bowing of railing. Notice that the white edge line is slightly shifted at the joint.

  16. Figure 17: Severe Damage: Deck Collapse

  17. Figure 18 and 19: Severe Damage: Deck Collapse

  18. Figure 18 and 19: Severe Damage: Deck Collapse (I-10 and SR 118 Damage from Northridge EQ http://itsdocs.fhwa.dot.gov/jpodocs/repts_te/13775.html)

  19. Figure 24: Moderate Damage – Flexural Cracking of Concrete Girder (KTC)

  20. Figure 32: Severe Damage: Steel girder buckling

  21. Figure 28: Moderate Damage: Crack in web of steel girder. Flag condition.

  22. Figure 27: Minor Damage - Web stiffener damage. Note paint chipping.

  23. Joint – Minor Cracking, Separation 100_8746

  24. Pounding Damage

  25. Collateral Damage

  26. Collateral Damage

  27. Joints & bearings

  28. Figure 16: Moderate Damage - Vertical and horizontal movement at joint indicates possible bearing or girder displacement and damage

  29. Figure 16: Moderate Damage - Vertical and horizontal movement at joint indicates possible bearing or girder displacement and damage 100_8561

  30. Figure 20: Minor Damage: Misaligned Finger Joint

  31. Joint – Minor Cracking, Separation

  32. Figure 21: Minor Damage: Transverse Movement Along the Centerline (Check for bearing damage.)

  33. Figure 22: Moderate Damage: Differential Settlement and Expansion Joint Damage

  34. Figure 23: Moderate Damage - Spalled Concrete

  35. Figure 49: No Damage: Tilted Rocker Bearings. Movement due to Thermal Loads (INDOT)

  36. Figure 53: Severe Damage. Rocker Bearing Failure

  37. Figure 53: Severe Damage. Rocker Bearing Failure

  38. Figure 54: Severe Damage. Missing Abutment Bearing After Northridge After Northridge

  39. Damage to Anchor Bolts. Mark ‘YES’ for column #4.

  40. Figure 30: Minor Damage. Damage to anchor bolts

  41. Secondary members

  42. Figure 25: Minor Damage - Buckled Bracing Element.

  43. Figure 31: Moderate Damage - Fracture of lower lateral bracing.

  44. Soils / geotechnical / foundation

  45. Figure 33: Ground movement indicating possible foundation problem

  46. Figure 55: Evidence of Liquefaction near a pier

  47. Tilted pier wall 100_8761