ALICE RF System Andy Moss & Alan Wheelhouse, ASTeC, Daresbury Laboratory. RF System. Main Menu RF Operation Switching on the IOTs RF Control Monitoring Systems IOTs Linac & Booster Cavities Buncher Cavity Pressure Monitoring. Main Menu. RF Drop Down Menu RF Buncher RF Booster 1

ALICE RF System Andy Moss & Alan Wheelhouse, ASTeC, Daresbury Laboratory - slide 1
01 / 20ALICE RF System Andy Moss & Alan Wheelhouse, ASTeC, Daresbury Laboratory
1 / 17

Télécharger la présentation

ALICE RF System Andy Moss & Alan Wheelhouse, ASTeC, Daresbury Laboratory
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. ALICE RF SystemAndy Moss & Alan Wheelhouse,ASTeC, Daresbury Laboratory ALICE RF System Andy Moss/Alan Wheelhouse

  2. RF System • Main Menu • RF Operation • Switching on the IOTs • RF Control • Monitoring Systems • IOTs • Linac & Booster Cavities • Buncher Cavity • Pressure Monitoring ALICE RF System Andy Moss/Alan Wheelhouse

  3. Main Menu RF Drop Down Menu • RF Buncher • RF Booster 1 • RF Booster 2 • RF Linac 1 • RF Linac 2 • RF PSU • Linac Module • Booster Module • RF Buncher • Adhoc RF Gain • Tuner Motor Test ALICE RF System Andy Moss/Alan Wheelhouse

  4. RF Operation ALICE RF System Andy Moss/Alan Wheelhouse

  5. RF PSU Control • Analogue Monitoring • Control Area • IOT Monitoring Main Menu → RF → RF PSU ALICE RF System Andy Moss/Alan Wheelhouse

  6. Switching On The IOTs • Press (Hold down) • Aux ON • SB ON • Filaments need 10 minutes • Check ion current is <1µA • HV ON • HV will slowly rise to 27kV, ~600mA • Check ion current is <1µA • Allow 10 minutes for the quiescent currents to stabilise • Switch RF ON ALICE RF System Andy Moss/Alan Wheelhouse

  7. RF On • Trace seen on oscilloscope • RF raised on each IOT to provide the required gradient for each of the Linac and Booster cavities • Check ion current is <1µA • Ditto for the solid state amplifier on the Buncher cavity ALICE RF System Andy Moss/Alan Wheelhouse

  8. RF Control – Linac & Booster Cavities Main Menu → RF → RF Linac 1 • RF power adjusted using the gradient • RF phase adjustment (station phase) • All other controls are fixed ALICE RF System Andy Moss/Alan Wheelhouse

  9. RF Control – Buncher Cavity Main Menu → RF → RF Buncher • RF power adjusted using the gradient • RF phase (station phase) • All other controls are fixed ALICE RF System Andy Moss/Alan Wheelhouse

  10. Operation • Quench • RF should switch off • If not immediately switch off rf press HV ON • Trips • Re-apply • Constant trips seek assistance • IOT arc detector trips need to be reset at the PLC • An additional screen will be added in the future ALICE RF System Andy Moss/Alan Wheelhouse

  11. Monitoring Systems ALICE RF System Andy Moss/Alan Wheelhouse

  12. IOT Readings • All IOT limits are set within the PLC • Power measurements • Drive • Output • Additional voltage readings Main Menu → RF → RF PSU → LC IOT5 ALICE RF System Andy Moss/Alan Wheelhouse

  13. Booster & Linac Readings • Power Measurements • Waveguide power • Cavity probe power Main Menu → RF → RF PSU → Linac ALICE RF System Andy Moss/Alan Wheelhouse

  14. Buncher Readings Main Menu → RF → RF PSU → Buncher ALICE RF System Andy Moss/Alan Wheelhouse

  15. Calibration Readings • Calibration readings for all the power measurements • DO NOT TOUCH Main Menu → RF → Adhoc RF Gain ALICE RF System Andy Moss/Alan Wheelhouse

  16. SC Module Monitoring • Monitoring for Booster and Linac Cavities • Cavity power and gradient • Waveguide powers • Cavity pressure • Cold & warm window temperatures Main Menu → RF → Linac Module ALICE RF System Andy Moss/Alan Wheelhouse

  17. Machine Vacuum Monitoring Main Menu → Machine → Vacuum ALICE RF System Andy Moss/Alan Wheelhouse

  18. Injector Vacuum Monitoring Main Menu → Injector → Vacuum ALICE RF System Andy Moss/Alan Wheelhouse

  19. Monitoring Main Menu → General → Monitoring • Radiation monitoring • Pressure monitoring ALICE RF System Andy Moss/Alan Wheelhouse

  20. Monitoring - Graphs Main Menu → Injector → Injector Vacuum → Log Pressure 1hr ALICE RF System Andy Moss/Alan Wheelhouse