An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sole Agent Informatics Pulse Ibrahim A. ALHawawi (CEO) Tele: (+966505470505) – (+966553595000) Informatics Pulse has the right of the sole agent in Saudi Arabia and neighboring Middle East contries regarding Kyce's construction technologies.If you have any questions about Kyce's construction technologies, please contact Informatics Pulseand inquire about them.

  2. Sole Agent Certificate

  3. KunYang Construction & Engineering Friendly Environmental Company Leading New Technology Obtained Inno-Biz Certification Designated as a Venture Business Authorized as a Research Institute Obtained ISO9001 / ISO14001 Certification Obtained Certificate Quality Innovation Excellent Company Obtained A Certificate of Business Transparency Awarded in 2002/2003 Korea Patented Technology Contest Selected as Good Technology of Small and Medium Enterprise Innovation Contest Tel: +82-42-472-0546 Fax: +82-42-472-0549 http:///www.kyce.co.kr Email: kyce2000@paran.com

  4. CONTENTS 1. Outline of Semi-shield method & Micro-shield / Micro-tunnelling 2. Characteristics of Semi-shield method & Micro-shield / Micro-tunnelling 3. Types of Semi-shield method & Micro-shield / Micro-tunnelling 3-1. Mud-injection earth pressure balance type 3-2. Water-injection earth pressure balance type 4. Construction Work Procedure of Semi-shield method & Micro-shield / Micro-tunnelling 5. Outline of HDD method 6. Characteristics of HDD method 7. Construction Work Procedure of HDD method 8. Construction Case (Micro-shield / Micro-tunnelling)

  5. Outline of Semi-shield & Micro-shield/Micro-tunnelling 조 직 도 (Micro-shield/Micro-tunnelling are also the same methods as that of Semi-shield.) • Semi-shield method is to minimize noise, dust, the ground subsidence, traffic difficulties and others caused by the existing open-excavation method for making sure of safety of civil infrastructure and support facilities such as upper sewerage, electricity, communication, gas pipe, airport, train and so on. • Early in development, open-shield manpower excavation method had been used but, to apply for the soft ground and an increase of sill’s construction and to cope with difficult construction work, mechanical excavation method has been developed and improved so that the semi-shield method of a Mud-injection earth pressure balance type has been widely supplied. • The semi-shield method of a Water-injection earth pressure balance type also has recently been used because of demerits of Mud-injection earth pressure balance type which were expensive costs of PLANT facility and work space for separating injected mud-water and soil.

  6. 2. Characteristics of Semi-shield method & Micro-shield/Micro-tunnelling (Micro-shield/Micro-tunnelling are also the same methods as that of Semi-shield.) • Long distance propulsion can be applied without equipments of middle bases. • Problems with the press of a propulsion pipe created in composite soil can be solved by automatic injection equipment of lublicator for soil. • Construction work of long distance and tunnel curve can be precisely carried out with automatic measurement equipment. • Minimize the ground displacement • Minimize traffic difficulties and environmental damage • Applicable to various kinds of soil • Construction period can be shortened with high propulsion speed. • Relatively small sizes of starting work shaft and arrival work shaft

  7. 3. Types of Semi-shield method & Micro-shield/Micro-tunnelling 조 직 도 (Micro-shield/Micro-tunnelling are also the same methods as that of Semi-shield.) 3-1. Mud-injection earth pressure balance type • Reinforcement support wall is constructed in front of shield machine and then by injecting Mud-water into the blind end sealed up and pressing it, it can be rapidly moved to soil discharge device with seeking safety of the blind end, moved out to the ground through a pipe together with the soil excavated by a rotating cutter. PLANT on the ground separates injected mud-water from the soil, and separated mud-water is reused for construction work while the soil is discharged.

  8. Types of Semi-shield method & Micro-shield/Micro-tunnelling 조 직 도 (Micro-shield/Micro-tunnelling are also the same methods as that of Semi-shield.) 3-2. Water-injection earth pressure balance type • This method is to propel shield with keeping a safety blind end by using the soil which was cut with a rotating cutter device depending on propulsion of shield and moved into cutter chamber. Only a moderate quantity of soil is discharged continually both through the machinery for soil discharge of screw type installed in cutting chamber and through machinery for soil discharge, such as slide gate or rotary feeder and others installed in shaft of just that machinery.

  9. 4. Construction Work Procedure of Semi-shield method & Micro-shield / Micro-tunnelling 조 직 도 (Micro-shield/Micro-tunnelling are also the same methods as that of Semi-shield.) Installation of starting work shaft Construction of reinforcement support wall Installation of a guide rail for propulsion Setting the propulsion work shaft Setting equipment and installation of a propulsion pipe Propulsion and Excavated soil discharge Repeat Linking propulsion pipe Installation of arrival work shaft Taking out equipment

  10. 5. Outline of HDD method 조 직 도 • As a kind of horizontal propulsion methods, this is the method of tunnelling through the ground surface-to-ground surface without vertical work shaft. • After fixing Bit on the end of pipe, the ground is punched and at this time, high pressure water is sprayed into the pipe. The service water used at this moment is to compound materials of bentonite or gel component.

  11. 6. Characteristics of HDD method 조 직 도 • Mainly used for establishing communication cable, electric power line • Short damage to the ground surface • Few civil petitions like traffic difficulties • Shortening construction period and being economical

  12. 7. Construction Work Procedure of HDD method 조 직 도 Checking out buried underground materials in punching section Preparing for equipment and construction materials Shooting Input drill head-> Control jetting pressure-> Checking out head position with deep locator-> Arrive at drill head target pit Reaming Remove drill head-> Attach reamer -> Fix Swivel pipe/cable with grip-> Control jetting pressure Completion Stop Jetting-> Remove swivel and grip from Pipe -> Seal up the shift of pipe/cable with end cap Arrangement of construction site and withdrawal

  13. 8. Construction Case (Micro-shield / Micro-tunnelling) Project D300. General soil L=50.0M Installation of laser measurement machine for direction adjustment Installation of a guide rail for propulsion

  14. Construction Case (Micro-shield / Micro-tunnelling) Project D300. General soil L=50.0M Initial work of a propulsion leading machine

  15. Construction Case (Micro-shield / Micro-tunnelling) Project D300. General soil L=50.0M Work of initial propulsion Join a propulsion leading pipe to a pipe

  16. Construction Case (Micro-shield / Micro-tunnelling) Project D300. General soil L=50.0M Propulsion after joining a propulsion leading pipe to a pipe Propulsion of a propulsion pipe

  17. Construction Case (Micro-shield / Micro-tunnelling) Project D800. Soil contained gravel L=116.0M Propulsion of a propulsion pipe

  18. Construction Case (Micro-shield / Micro-tunnelling) Project D800. Soil contained gravel L=116.0M Display propulsion conditions on monitor Inject lublicator for soil

  19. Construction Case (Micro-shield / Micro-tunnelling) Project D800. Soil contained gravel L=116.0M Pull up a propulsion leading machine after separating from a propulsion pipe Arrival of a propulsion leading machine at the final base

  20. Construction Case (Micro-shield / Micro-tunnelling) Project D800. Soil contained gravel L=116.0M Separate Auger in casing & take it out after finishing propulsion

  21. Construction Case (Micro-shield / Micro-tunnelling) Project D500. General soil L=60.0M Propulsion of a propulsion pipe

  22. Construction Case (Micro-shield / Micro-tunnelling) Project D500. General soil L=60.0M Join a propulsion pipe Propulsion of a propulsion pipe

  23. Construction Case (Micro-shield / Micro-tunnelling) Project D500. General soil L=60.0M Arrival of a propulsion leading machine at the final base Pull up a propulsion leading machine after separating from a propulsion pipe

  24. Construction Case (Micro-shield / Micro-tunnelling) Project D500. General soil L=60.0M Separate Auger in casing & take it out after finishing propulsion

  25. Thank you for Attention