Bridge Report

Bridge Report. Team Total Domination. Outline. Introduction…………….. Zach Chaviers Prototype……………….. Ali Nikkhah Final Design……………. Bobby Schneider Conclusion……………… Derrick Wang. Introduction Prototype Final Conclusion.

maree
Télécharger la présentation

Bridge Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bridge Report Team Total Domination

  2. Outline • Introduction…………….. Zach Chaviers • Prototype……………….. Ali Nikkhah • Final Design……………. Bobby Schneider • Conclusion……………… Derrick Wang Introduction Prototype Final Conclusion

  3. Problem • Build most efficient bridge • Efficiency: • Limited to 125 tongue depressors Introduction Prototype Final Conclusion

  4. Background • Warren Truss • Component testing • Four-step process Introduction Prototype Final Conclusion

  5. Prototype Design • 3 preliminary designs • Criteria for design • Simple • Triangle-based • Allow for easy layering Introduction Prototype Final Conclusion

  6. Construction • Warren Truss design used • Built quickly • Main goal: test structure Introduction Prototype Final Conclusion

  7. Before Testing Introduction Prototype Final Conclusion

  8. Test • Stable load increase • Bent at joint • Support popped out Introduction Prototype Final Conclusion

  9. Test Introduction Prototype Final Conclusion

  10. Results • Max load 397 pounds • Efficiency: 630 • Joints weak Introduction Prototype Final Conclusion

  11. Final Design • Fix weaknesses • Joints • Glue type • Precision • Symmetry Introduction Prototype Final Conclusion

  12. Construction • Graph paper • Clamping • Glue Coating Introduction Prototype Final Conclusion

  13. Before Testing Completed Final Bridge Introduction Prototype Final Conclusion

  14. Test • Stable load increase • Twisted • Did not break Introduction Prototype Final Conclusion

  15. Test Introduction Prototype Final Conclusion

  16. After Testing Dead Bridge Introduction Prototype Final Conclusion

  17. Results • Max load 811 pounds • Efficiency: 1080 • 71% more efficient Introduction Prototype Final Conclusion

  18. Summary • Truss Design • Prototype performed well • Minor changes made • Improved performance Introduction Prototype Final Conclusion

  19. Improving Final Design • Stabilizers created rectangles • Add triangles to prevent twisting Introduction Prototype Final Conclusion

  20. References • http://cee.carleton.ca/Exhibits/Tacoma_Narrows/ • http://www.nwrain.com/~newtsuit/recoveries/narrows/narrows.htm • http://www.bridgemeister.com/pic.php?pid=839 Introduction Prototype Final Conclusion

  21. Any Questions?

  22. Team TOTAL DOMINATION Ali Nikkhah Zach Chaviers Derrick Wang Bobby Schneider

More Related