1 / 4

Integrated Nutrients Pollution Control Project LN 4873 – RO WBTF 050327-RO

Integrated Nutrients Pollution Control Project LN 4873 – RO WBTF 050327-RO. Government of Romania. Global Environment Facility. The World Bank. MINISTRY OF ENVIRONMENT AND CLIMATE CHANGE ROMANIA . Naiana Milea - PMU Director.

maren
Télécharger la présentation

Integrated Nutrients Pollution Control Project LN 4873 – RO WBTF 050327-RO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Nutrients Pollution Control ProjectLN 4873 – ROWBTF 050327-RO Government of Romania Global Environment Facility The World Bank MINISTRY OF ENVIRONMENT AND CLIMATE CHANGE ROMANIA Naiana Milea - PMU Director

  2. a) use of analysis data provided by a ground and surface water monitoring program performed by ANAR, in the Project area, using 124 piezometers and 84 surface water sampling points; Methodology for evaluating the reduction of nutrients discharge in the Project area • b) use of proxies to estimate the reduced N & P discharge into the water bodies.

  3. Stress reduction measurements: Pollution reduction practices

  4. Stress reduction measurements: Agricultural pollution reduction practices Target for end of Project: 300,000 kg N/year

More Related