1 / 14

AUTOMOTIVE ASSEMBLY PROCESSES

AUTOMOTIVE ASSEMBLY PROCESSES. John L. Evans, Ph.D. AUTOMOTIVE SUPPLY CHAIN. SHEET METAL POWERTRAIN (ENGINE & TRANSMISSION) INTERIOR (SEATS, DASH, CARPET) ELECTRONICS LIGHTING TIRES & BRAKE SYSTEMS COOLANT SYSTEM CHASSIS GLASS. REGIONAL AUTOMOTIVE SUPPLIERS. AUTOMOTIVE FACILITIES.

Télécharger la présentation

AUTOMOTIVE ASSEMBLY PROCESSES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AUTOMOTIVE ASSEMBLY PROCESSES John L. Evans, Ph.D.

  2. AUTOMOTIVE SUPPLY CHAIN • SHEET METAL • POWERTRAIN (ENGINE & TRANSMISSION) • INTERIOR (SEATS, DASH, CARPET) • ELECTRONICS • LIGHTING • TIRES & BRAKE SYSTEMS • COOLANT SYSTEM • CHASSIS • GLASS

  3. REGIONAL AUTOMOTIVE SUPPLIERS

  4. AUTOMOTIVE FACILITIES • 200,000 to 700,000 + units per year • $1 - $3 Billion Investment • 10 – 20 Miles of Conveyors • 250+ Robots (Welding, Painting, Sealing) • $10 Million per day – Incoming Materials • 250+ Acres Site Requirements • $500,000 - $1,000,000 per month Utilities

  5. MATERIALS FLOW • Process Must Match • Powertrain (Engine, Transmission) • Seats • Exterior Styling (Grill, Trim, Color) • Features (Audio, Computer, RKE) • Glass • JIT Delivery System • Material AS/RS • Quality Inspection http://www.workhorsecc.com/tours/virtual.asp

  6. ENVIRONMENTAL CONTROL • PAINTS • VEHICLE WASH • COOLANTS • SEALANTS • GASOLINE & OIL • AIR CONDITIONING SYSTEMS • EXHAUST

  7. ENGINE ASSEMBLY

  8. ASSEMBLY AUTOMATION

  9. INTERIOR ASSEMBLY FEED

  10. TIRE ASSEMBLY FEED

  11. CAR ASSEMBLY ROUTE

  12. AUTOMATIC WELDING

  13. ASSEMBLY TRACKING

  14. VEHICLE TRACKING • JIT System for Parts Delivery • Material Flow Must be in Order • Part Availability Must be Checked Early in Process • Vehicle Process Problems Must Consider Materials Flow • System Quality Must be Monitored Throughout Operation • Mercedes-Benz U.S. International, Inc. - Home of the M-Class

More Related