170 likes | 272 Vues
Explore findings from Saint Croix Central Task Force regarding existing elementary, middle, and high school capacities, enrollment projections, and classroom need scenarios. The report suggests short-term solutions like adding classrooms to address K-4 growth, special education room, and pending pressure at 9-12 grades. It highlights building grade levels, projected student enrollment, modified and existing building capacity, and growth models. The recommendation includes a building addition, grade level reconfiguration, programming improvements, and a potential high school addition. Learn about implementation strategies, energy performance funding, maintaining assets, and potential referendums for improvements. Don't miss the discussion on extra-curricular needs and district-wide projects within proposed referendums.
E N D
Saint Croix Central Task Force Findings May 2, 2012
Short Term Need • Classrooms to Address K-4 Growth • (3+) Classrooms • (1) Special Education Room Additional Need • Pending Pressure at 9-12 • Program Pressure at High School • Extra-Curricular Needs In District
GROWTH MODEL BUILDING GRADE LEVELS PROJECTED STUDENT ENROLLMENT 745 BUILDING ADDITION CLASSROOMS AVAILABLE K-5 6 Classroom Addition 32 26 32 CLASSROOMS NEEDED 650 650-800 MODIFIED BUILDING CAPACITY BUILDING CAPACITY
586 586 439 402 417 384 397 416 K-4 K-4 5-8 5-8 5-8 9-12 9-12 9-12 27 27 27 27 27 23 23 23 641 641 565 565 565 460 460 460 27 631 K-4 27 27 GROWTH MODEL 1,372 Actual Enrollment 2010-11 1,400 2011-12 Task Force 1,486 Projected Enrollment 2012-13 641
653 643 468 452 460 445 426 421 K-4 K-4 5-8 5-8 5-8 9-12 9-12 9-12 27 27 27 27 27 23 23 23 641 641 565 565 565 460 460 460 27 638 K-4 27 27 GROWTH MODEL 1,525 2013-14 Task Force Referendum (Fall 2014) 1,529 2014-15 Design 1,551 2015-16 Construction 641
478 482 523 536 534 573 K-3 4-7 8-12 27 27 27 27 27 31 540-620 550-595 23 507 23 27 GROWTH MODEL 1,585 +8 Station Addition 2016-17 Move 4th Grade Move 8th Grade Implement Targeted Class Sizes 620-695 608 1,626 K-3 4-7 8-12 2017-18 31 540-620 550-595 620-695 Task Force? 618 1,648 K-3 4-7 8-12 2018-19 31 540-620 550-595 620-695
529 484 506 27 27 27 24 582 25 27 GROWTH MODEL 637 1,672 K-3 4-7 8-12 2019-20 31 540-620 550-595 620-695 673 1,709 K-3 4-7 8-12 2020-21 31 540-620 550-595 620-695 Task Force?
Potential High School Addition • 8 Teaching Stations • (4) Classrooms +/- • (2) Science or STEM Labs +/- • (2) Technology Labs • Scope TBD • Expand / Improve Core Functions • Activities & Athletics Improvements • Gymnasium Addition • Locker Room Expansion • Wrestling & Weights / Fitness Expansion • Performing Arts Improvements • Auditorium Addition • Music Suite Improvements
Recommendation • Implementation of Capital Projects • Utilize Energy Performance Funding • Maintain Existing Assets • Classroom Addition to High School • Grade Reconfiguration to Ease Capacity Demand • Programming Improvements at Each • 2013 or 2014 Referendum • Review of Extra-Curricular Needs • Include Within Referendum • Consider District-Wide Projects with Proposed Referendum • Reconvene Task Force Fall 2012