1 / 4

CDF Burn-in Experience

CDF Burn-in Experience. Hybrid Burn-in 4 days with extensive tests at start/end ~9 out of 8000 chips failed (0.1%) DOIM Burn-in ?????? Ladder Burn-in 4 days with periodic readout tests 126 pinholes in 312064 channels (0.04%) Most occurred early in burn-in (<5 hours) Failure of HV lines

mariel
Télécharger la présentation

CDF Burn-in Experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDF Burn-in Experience • Hybrid Burn-in • 4 days with extensive tests at start/end • ~9 out of 8000 chips failed (0.1%) • DOIM Burn-in • ?????? • Ladder Burn-in • 4 days with periodic readout tests • 126 pinholes in 312064 channels (0.04%) • Most occurred early in burn-in (<5 hours) • Failure of HV lines • Leaky paths, sparking between HV, gnd Previous Burn-in Experience

  2. CDF Burn-in Experience • After Instillation • 2 failed DOIM packages out of 556 (0.4%) • ???? Single channel DOIM failures • Assuming same rate of failure are CDF • ~2% SS (~5% DS) rods with at least one chip failure • ~71% SS (~91% DS) rods with at least one pinhole • ~2% SS (~5% DS) rods with at least one optical failure Previous Burn-in Experience

  3. Projection to CMS • Assuming same rate of failure are CDF • ~2% SS (~5% DS) rods with at least one chip failure • ~71% SS (~91% DS) rods with at least one pinhole • ~2% SS (~5% DS) rods with at least one optical failure • CMS should have fewer failures • APV simpler than SVX3D • Optical hybrids more standard than DOIM • Single sided sensors vs. double • Different technologies may yield higher rates of failure Previous Burn-in Experience

  4. Experience at CMS • 1 out of 4 thermal cycled modules at Aachen developed opens (4) between PA-sensor • 1 additional module had >300 opens develop after 1 thermal cycle • All previous experience at CMS with non-”final” technology choices Previous Burn-in Experience

More Related