Building 918 and online farm

Building 918 and online farm. A. Gianoli , M. Serra, P. Valente. Building 918. Refurbishing of building 918 is needed after about 30 years operation and NA60 dismantling:

marika
Télécharger la présentation

Building 918 and online farm

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building 918 and online farm A. Gianoli, M. Serra, P. Valente

  2. Building 918 Refurbishing of building 918 is needed after about 30 years operation and NA60 dismantling: • Not only the NA60 detector and beam line in the ECN3 cavern have been dismantled, but also the control room and the crates room upstairs in building 918 • Our aim is to refurbish the NA62 control room and conference room and to have a computer room for the new PC farm • Michael Jeckel is in charge for CERN EN-MEF • We have to provide our infrastructure requirements: • detailed plan and occupation of the different spaces • electrical and cooling power • chilled water supply • Network, phones, access control, etc…

  3. PC farm We have to estimate now what will be our needs for the NA62 PC farm in terms of: • Computing power • Storage • Number and bandwidth of network links between: • The farm and the experiment in ECN3 • The farm and the CERN IT computing center and outside world • Among the machines in the farm itself These requirements will in turn determine our needs in terms of • Electrical power • Cooling power … and, together with the racks cooling technology choices, will have consequences on: • Footprint and needed spaces • Infrastructure (chilled water, cooling plant, UPS, etc.)

  4. PC farm Racks: • Water-cooled 19’’ racks, with air/water heat exchanger mounted on the rear door, 9-10 kW/rack • Water inlet 15 °C, outlet 25 °C, pressure drop 1 bar • We have space for up to 2×19 racks, but we started considering approximately 1/2 occupation (we also will have storage, network switches) • We take as a reference 150 kW total power • e.g. for the UPS we consider 15 min. for 200 kVA

  5. Computing room plan PC farm UPS

  6. General building plan