1 / 16

Dioxin Emissions in Candidate Countries

Dioxin Emissions in Candidate Countries. Improving the knowledge on dioxin emissions in CCs: A measurements strategy Ulrich Quass IUTA e.V., Duisburg, Germany. Dioxin Emissions in Candidate Countries. Emission measurements within the project. WHY (Purpose of measurements)

marina
Télécharger la présentation

Dioxin Emissions in Candidate Countries

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dioxin Emissions in Candidate Countries Improving the knowledgeon dioxin emissions in CCs: A measurements strategyUlrich QuassIUTA e.V., Duisburg, Germany

  2. Dioxin Emissions in Candidate Countries Emission measurements within the project... • WHY (Purpose of measurements) • WHICH (selection of sources) • WHAT (methodology) • WHO (sampling teams, laboratories) • WHEN (time schedule)

  3. Dioxin Emissions in Candidate Countries WHY? Check compliance with limit values Evaluate and improve emission factors P Check potentially relevant sources P First results for unknown source types P Rise awareness P Capacity building in CCs

  4. Dioxin Emissions in Candidate Countries WHICH? Excluded source types: • Waste incinerators • Diffuse non-industrial sources dom. burning, vehicular emissions re-volatilsation of PCDD/F fires

  5. Dioxin Emissions in Candidate Countries WHICH? Probably irrelevant sources, unless specific indications: • Gas/oil power plants • Coal power plants with DeSO2/DeNOx • Blast oxygen furnaces • Primary non-ferrous metal production • Dry cement kilns without supplemental fuels

  6. Dioxin Emissions in Candidate Countries Limit for waste incineration: 0.1 ng I-TEQ/m³ European Pollutants Emission Register (EPER):1 g I-TEQ/year WHICH? Relevance Criteria: A. Stack gas concentration (ng I-TEQ/m³) B. Annual emission (g I-TEQ/year)

  7. Dioxin Emissions in Candidate Countries

  8. Dioxin Emissions in Candidate Countries Limit for waste incineration: 0.1 ng I-TEQ/m³ European Pollutants Emission Register (EPER):1 g I-TEQ/year WHICH? Relevance Criteria (amended): A. Stack gas concentration (ng I-TEQ/m³) B. Annual emission (g I-TEQ/year) C. Stack height (for low flow/ high concentration sources)

  9. Dioxin Emissions in Candidate Countries EN 1948, 1-3 Campaign duration 4-5 days expensive analysis high measurement costs WHAT? Waste incineration Directive: sampling time typ. 6 hours (8 h max) analysis with HRGC/HRMS

  10. Dioxin Emissions in Candidate Countries Cost minimisation by...

  11. Dioxin Emissions in Candidate Countries ...methodological simplification Stack sampling:2-day campaigns, max. three 2(3)-hour samples Analysis: 1st sample extract split into two fractions: • HRGC/HRMS (exact I-TEQ- determination) • simpler GC/MS (order of magnitude) 2nd/3rd sample: • „Simple“ analysis or • analysis only in case of discrepancies

  12. Dioxin Emissions in Candidate Countries WHO? A. Sampling Needed: experienced teams (proof required) 1. preference: companies/institutes from CCs 2. preference: co-operative activities CC/EU 15 3. preference: companies/institutes from EU 15

  13. Dioxin Emissions in Candidate Countries WHO? B. Analysis Favourable: CC based institutes Needs: • experienced laboratories (proof required) • good co-operation with sampling team • QC analysis by independent lab (e.g. TNO, IUTA or other)

  14. Dioxin Emissions in Candidate Countries WHEN? Mar- July 03: proposals of sources (CC institutions) • Not yet measured, operator´s permit available • Likely to be relevant July-Aug 03: priority list/preliminary work plan/call for tenders (TNO/IUTA/DG ENV/JRC)

  15. Dioxin Emissions in Candidate Countries WHEN? Sept 03: decision on work plan/commitments Sept-Nov 03: First phase of measurements Mar – Sept 04: Second phase of measurements Oct 31st, 04:deadline for measurement reports

  16. Thank you for your attention

More Related