html5-img
1 / 33

From yield optimization to manufacturing cost control

From yield optimization to manufacturing cost control. OXOCHIMIE Lavera - France François GERMAIN Plant manager. Oxochimie. Bienvenue en Provence. Lavera en Provence. Lavera site. ELF ATOCHEM. 33.600 PEOPLE. 43 Bn$ TURNOVER. OXOCHIMIE - 1999. BPA CHEMICALS. 17.000 PEOPLE.

marina
Télécharger la présentation

From yield optimization to manufacturing cost control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. From yield optimization to manufacturing cost control OXOCHIMIE Lavera - France François GERMAIN Plant manager

  2. Oxochimie

  3. Bienvenue en Provence

  4. Lavera en Provence

  5. Lavera site

  6. ELF ATOCHEM 33.600 PEOPLE 43 Bn$ TURNOVER OXOCHIMIE - 1999 BPA CHEMICALS 17.000 PEOPLE 14 Bn$ TURNOVER 50 % OXOCHIMIE 100 PEOPLE 100 M$ TURNOVER 50 %

  7. What are we doing? • We are making basic chemicals • Production de 300 000 Tonnes/year of OXO-alcohols • Applications for plasticisers, paints, inks, solvents… • 5th world producer of Oxo-alcohols

  8. Summary 1. Before PI 2. A fast track project 3. Rapids benefits of PI 4. Reports 5. Data reconciliation + demo 6. Link to manufacturing costs

  9. When? PRINTOUTS RE-KEYING OF DATA LABORATORYREPORTS TELEPHONE CALLS Time consuming to consolidate reports HUMAN ERROR Before PI

  10. The PI project • Initiated by Elf group • Limitation with DCS historical(ABB MOD 300) • Motivated team for installing the PI system • Fast project • Immediate results

  11. Project planning • Dec 96: Project definition • Jan 97: Project kickoff • Feb 97: Hardware purchase • March 97: PI start up • Avril 97: User training • June 97: Laboratory transfer on PI • Feb 98: Automatic daily reports • March 98: Manufacturing costs

  12. PI implementation • DCS: ABB MOD 300 • Alpha server 1000A 5 / 333 - VMS 7.1 • PI2 license 5000 tags (3800 used) • existing PC network (W95)

  13. What they say about PI (1) Console operator« It is a great advantage of PI above DCS historical, Process Book gives facilities to configure appropriate scales, time ranges, tags… » Shift supervisor« When you are back on the plant after a shift break, we do identifie previous modifications . With 2 or 3 clicks we get the right information… »

  14. What they say about PI (2) Day foreman« The system is user friendly » Lab supervisor« By mixing lab data and process, we do understand the quality variations » Logistic engineer« With PI and associated tools, we really get the right data. Time consuming is divided by 3 »

  15. What they say about PI (3) PI administrator« The PI system gave me hard days at start up,but It is a pleasure to see people happy with it » Site general Manager «PI is the good tool, we will install it on the other plants »

  16. Rapid benefits • After training phase, Process book was largely used for trouble shooting mainly • Every incident is investigated with PI • Increased reliability • Daily optimization • Obtain returns

  17. Plant reliability %

  18. Daily reporting • Manufacturing report show yield variations and performance • Laboratory reports include process data • PI Data link + PI Perf equation usage • Replacement of our rekeyed report by automatic PI reports

  19. Morning manufacturing report

  20. Morning laboratory report

  21. Other reports • Monthly manufacturing report: Totaliser tags: integration of daily rates • Identification and reconstruction of plant model (unit by unit): mass balance • Maintenance report: usage rate of equipments

  22. Corporate application tools used • X / Y add-in in Procbook for correlation study • Comparison of laboratory analysis versus on line analyzer • Temperature profile analysis for tubular reactors • SQC reports from laboratory (Excel 97)

  23. Data reconciliation • Complexity of numerous units and links • What is Datrec? • Demo

  24. Complexity of units products links

  25. What is Datrec • Reconciliate data • Detect faulty measurement device • Compute daily/monthly material balance for the whole plant from raw materials to finished products • Developed by Elf research center (Solaize) • Distributed by Honeywell and Technip

  26. General characteristics • Treat any redundancy equation:- Linear (mass balance) - Non linear (energy balance, constituent balance) • Estimate the missing measurements • Power of maths in user friendly interface • PI Interface (through PI API):- instantaneous - average - integration

  27. Results with Datrec • Gets accuratecoherent and reliable data to generate yield and mass balance • Improves data quality, feed back of faulty values • Feeds sound data for manufacturing costs calculation

  28. PI / Datrec / Cost system PI Daily balance Plant DATREC Data PC VCS Production report COSTS Monthly balance

  29. DATREC DEMO

  30. Manufacturing cost project Objectives: • Calculate the variable costs of productions based on market prices. • Generate quantity repartition by product for each shareholder

  31. VCS OXOPRINCIPLES • PI: collect technical data + mass balance + analysis of deviations • DATREC: reconciliate data • PC: chemicals consumption and prices • VCS:Variable Cost system. feed stock balance (production / stocks / sales). consumption by product - cost calculation of each product - product cost for each shareholder - variance reports

  32. Questions ?