1 / 4

Round 1 Debrief - AM

Round 1 Debrief - AM. Add more people to folding op 2! Break folding into three steps? Redefine jobs? Production scheduler hands off to kiter Consolidate inspection/rework Implement point of use inspection (fold back) Combine kiting with folding op 1

marva
Télécharger la présentation

Round 1 Debrief - AM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Round 1 Debrief - AM • Add more people to folding op 2! • Break folding into three steps? • Redefine jobs? • Production scheduler hands off to kiter • Consolidate inspection/rework • Implement point of use inspection (fold back) • Combine kiting with folding op 1 • Eliminate batches?? => pull from shipping dock • Recruit water strider

  2. Round 2 Changes - AM • Stick with production schedule (batches of 4)move tables • Combine production scheduler/kiter;Eliminate need for supervisor • Add workers at fold op2 • Add Water strider at fold op2 • Sales communicates directly with shipper

  3. Round 2 Debrief - AM

  4. Round 2 Changes - AM

More Related