Readiness for scintillation blocks characterisation at Prague. Vít Vorobel. Area Scheme. Radio-contamination prevention. Clean room personal protective equipment (coat, cap, facecloth, gloves, shoes). Dust, temperature and humidity monitor. Sticky pad at the entrance.

matthewm
Télécharger la présentation

Readiness for scintillation blocks characterisation at Prague

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Readiness for scintillation blocks characterisation at Prague Vít Vorobel

  2. Area Scheme

  3. Radio-contamination prevention • Clean room personal protective equipment (coat, cap, facecloth, gloves, shoes) • Dust, temperature and humidity monitor. • Sticky pad at the entrance.

  4. Radio-contamination prevention • Air Conditioning Unit, DAIKIN, Split FTXR-EV1B • Control of temperature and humidity. • Dust filtering. • Laminar Flow Box, Heraguard HPH 12/95 • HEPA filters H14, efficiency >99.999% for particles 0.3 mm. • Horizontal air flow. • We are getting an experience with dust. • Present level: • Flow-Box OFF →10^6-10^7 particles 0.5 μm / m^3 • Flow-Box ON → 10^3-10^4 particles 0.5 μm / m^3 • Manipulations with naked blocks to be done inside the Laminar Flow Box.

  5. Electron Source • Monoenergetic electron source - “Spectrometer” • Power SuplyTTi, PC controlled. • 2 magnet yokes (for 2 spectrometers), low hysteresis material. • 90Sr, 370MBq • Coil, shielding…tiny components expected form Dubna in 1 month, transport permitting needed. • Spectrometer calibration • Si(Li) detector, 3 mm thickness, 20 mm2. • Si(Li) 5 mm, 75 mm2. • 207Bi, 100 kBq. • XY-table • Range increased to 45 x 45 cm. • Velocity 38 cm/min. • Control with PC serial port.

  6. Measurement • Black Box 100 x 130 x 130 cm • enough space for XY-table, “spectrometer” and 4 X-wall blocks with PMTs. • PMTs • ≥4pieces of NEMO-3 5’ PMTs to be delivered from LSM in 2 weeks. • Delta E - Polystyren 300 μm, 2 PMTs in coincidence • Signal readout – Digitizer CAEN V1720, 8 channel

  7. Other material • Mylar – expected delivery next week • Mylar film 12µ 16,8g/m² métallisé Alu 1 face, width: 1185m • 1 roll of ~ 17-20kg 1000linear meter, MICEL Industrie • Teflon tape – Czech, French? • Optical contact – glycerol?

  8. Readiness for blocks characterisation at Prague • Red text is for missing items or actions. • Radio-contamination prevention • “Clean” Room 2.6 x 4.3 m, entry 2.6 x 1.2 m. • Dust, temperature and humidity monitor. • Clean room personal protective equipment (coat, cap, facecloth, gloves, shoes). • Sticky pad at the entrance. • Air Conditioning Unit, DAIKIN, Split FTXR-EV1B • Control of temperature and humidity. • Dust filtering. • Laminar Flow Box, Heraguard HPH 12/95 • HEPA filters H14, efficiency >99.999% for particles 0.3 mm. • Horizontal air flow. • We are getting an experience with dust. Present level: • Flow-Box OFF -> 10^6-10^7 particles >0.5mum • Flow-Box ON -> >10^4 particles >0.5mum • Manipulations with naked blocks to be done inside the Laminar Flow Box.

  9. Measurement • Black Box 100 x 130 x 130 cm • enough space for XY-table, “spectrometer” and 4 X-wall blocks with PMTs. • XY-table • PC control, range 45 x 45 cm. • PMTs • ≥4pieces of NEMO-3 5’ PMTs to be delivered from LSM in 2 weeks. • Signal readout – Digitizer CAEN V1720 • Monoenergetic electron source - “Spectrometer” • Power SuplyTTi, PC controlled. • 2 magnet cores (for 2 spectrometers), low hysteresis material. • 90Sr, 370MBq • Coil, shielding…tiny components expected form Dubna in 1 month, transport permitting needed. • Spectrometer calibration • Si(Li) detector, 3 mm thickness, 20 mm2. • 207Bi. • Other material • Mylar – expected delivery next week • Teflon tape – Czech, French? • Optical contact – glycerol? Potential BOTTLENECK Other actions are linked to that! BOTTLENECK !!! Other actions are linked to that!