An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. S78 S67 S56 PC PM SEQ S45 PIC EE VAC CYO QPS Summary of sector 45 operational tests On behalf of all the people Involved in the HWC R. Alemany LHCCWG

  2. PM PC SEQ PIC S45 EE VAC CRY QPS Cryo Performance 120 100 80 60 40 20 NOV07 DEC07 JAN08 FEB08 S45 R. Alemany LHCCWG

  3. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary PCS: Splice Check (200 A) PLI3: Circuit Protection at I_INT S45 PCC: Power Converter Configuration PIC2: Interlocks Test PNO: Powering to Nominal R. Alemany LHCCWG

  4. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary (*) Short circuit detected at warm - circuit condemned (to be repaired during warm-up). S45 R. Alemany LHCCWG

  5. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary S45

  6. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary S45 24.02.08 13H 24.02.08 25.02.08 24.02.08 14H

  7. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • PGC Matching Section (13-14.02.08): IPQ 120 A S45 R. Alemany LHCCWG

  8. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary LL5 S45 R. Alemany LHCCWG

  9. PGC Arc (+ MR4&LL5) (19.02.08): PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • Test Plan: • 2 kA FPA • 4 kA FPA • Heat Run @ 9kA + squeeze S45 R. Alemany LHCCWG

  10. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary Heat Run with RB, QD, QF @9kA (19.02.08) RB VS_FAULT S45 R. Alemany LHCCWG

  11. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary MR4 & LL5 Squeeze (19.02.08) S45 R. Alemany LHCCWG

  12. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • PGC Summary: • RB settings generated from calibration curves obtained from FIDEL model. • The rest of the magnets: linear calibration from layout database. • Ramp to 5.3 TeV. • Optics used: V6.500. • PGC of sector 45 done with LSA and timing system for synchronized ramps. Tests driven by: • LHC Sequencer: PGC of the Matching Sections (see slide 7). • Equip State: PGC of the Arc (see slide 9). S45 R. Alemany LHCCWG

  13. PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • Special thanks to: • HWC Teams. • LHC OP Team. • LSA Team. • Database Management Team. • Sequencer Team. Please, forgive me if I forget somebody S45 R. Alemany LHCCWG