1 / 7

GLOBAL CITY BUSINESS PARK The Project

GLOBAL CITY BUSINESS PARK The Project The first phase of the Class A office park comprises of 56.000 m m2 built area and 45.000 m m2 of net area spread over two buildings situated in a park like,landscaped setting with emphasis on a high quality,

mckile
Télécharger la présentation

GLOBAL CITY BUSINESS PARK The Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GLOBAL CITY BUSINESS PARK The Project The first phase of the Class A office park comprises of 56.000 m m2 built area and 45.000 m m2 of net area spread over two buildings situated in a park like,landscaped setting with emphasis on a high quality, functional and pleasant work environment. • Two levels of underground parking offer 844 parking places, providing 1 place for each 50 m m2 of office space, in addition to abundant street level parking bays; • The two office buildings are designed in such a way that they afford flexible floor plates ranging from 1.600 m m2 to 2.800 m m2 in size; • Modules to be rented starting from 300 m m2 per floor; • An integral part o Global City is the ground floor retail arcade which will provide convenience shopping, gastronomy and various other services to tenants and their guests.

  2. GLOBAL CITY BUSINESS PARK Technical Specification • Each building provides open plan layout from 1.600 m2 up to 2.800 m2 in size, organized on a 8.1m structural grid, with floor loading capacity of 4kn/m2 throughout • Office floors have a clear height of 2.80 m • 20 cm raised floor • Suspended ceiling with built-in fluorescent lights to achieve 500 lux on the work plane • 18 high speed lifts spread over four main service cores facilitate the subdivision of space on each floor to suit the tenants’ needs • All buildings are air conditioned using ceiling mounted fan coils on a 4 pipe HVACsystem (1/10m2 plus 10%) • Ventilation system, fresh air ductwork supply 12 litres/s/person and exhaust to all areas • High safety standards throughout the buildings: sprinklers, fire alarm and emergency standby generator for offices; sprinklers and smoke ventilation control systems for car parks • Modern access control and security system combined with security personnel

  3. GLOBAL CITY BUSINESS PARK

  4. GLOBAL CITY BUSINESS PARK - SITE PHOTOS - Construction started in September 2007; - Completion date: April 2009.

  5. GLOBAL CITY BUSINESS PARK Transportation • Global City BC shuttle bus line – buses and minibuses (included in service charges) – Route: from Pipera Subway Station (stop in front of the station)-Global City Business Park; – Schedule: Monday to Friday at 6:50, 08:15, 08:45, 11:15, 13:00; Saturday at 9:45; – Route: from Global City Business Park to Pipera Subway Station; – Monday to Friday at 12:45, 13:15, 17:05, 17:20, 17:25, 18:05, 19:05, 20:20; Saturday at 14:10; • Public Transportation Line 165 165- Isuzu buses buses- line provided by the City Hall operating on 25th of April 2009 – Route: Aurel Vlaicu Subway Station – Pipera Subway Station- Petricani Street intersection with Dimitrie Pompei Blvd (station of trams 16 and 36) - Global City Business Park (stops in front of the building) - OMV Gas Station (where it turns); – Schedule: every 10 minutes between 7.00 - 10.00 and 16.00 - 19.00;– Price per ticket 1.5 RON; – The schedule will be revised based on the growing number of the passengers; considering it’s a new line, it will be used mainly by Global City tenants, until people in the area will become aware of its existence; for the moment the buses are branded with Global City logo. With the increasing number of passengers, the number of buses will be supplemented as well the schedule, it will be extended; • Extra municipal public lines 445 si 567 – Isuzu buses, 24 places – Route: Pipera Subway Station (stop in front of the station)- Global City Business Park – Zoo Baneasa – Dimieni; – Schedule: between 05:00 - 24:00; – Price per ticket 2 RON.

  6. GLOBAL CITY BUSINESS PARK Access and infrastructure improvements • The project provides easy access to the two airports, Baneasa and Otopeni and is within a short drive to the northern fringe of the city center – the areas around PiataVictoriei and Piata Charles de Gaulle. • In terms of public transportation, the district is served by the Pipera metro station, the northern terminus of Bucharest Metro Line 2, busses and two tram lines: – Subway – the Pipera stop – Buses – numbers 112,135 and 445 – Tramways - numbers 16 and 36 • The access to the premises is done through 3 main boulevards, namely SosPetricani, coming from Tei district, through DimitriePompei Blvd, coming from BarbuVacarescu area, Sos. Pipera coming from Baneasa and IancuNicolae area. • The project is 6 km away from PiataVictoriei, 1 km away from the future Bucharest -Brasov highway and only 5 km away from the Baneasa Forest. • A shuttle bus service will be provided from Pipera metro station to the Office building • As future infrastructure improvements in the area, several aspects should be mentioned: Bucharest Nord Blvd will enlarged to 4 lanes, a viaduct over the railway and a new boulevard parallel with the railway will be developed by the City Hall to ensure a fluid traffic in the area. The new boulevard called Octavian Goga Boulevard will connect SoseauaBucuresti-Nord with the ring road. • Another aspect is the construction of the new Bucharest-Brasov highway that will take over the traffic exiting the city.

More Related