150 likes | 260 Vues
This plan outlines various risk mitigation activities for Phase B, including antenna qualification, SCM/MAG/FGM trade, MAG performance over temperature, MAG/SCM interference, with mitigation plans in place for all identified risks.
E N D
FIELDS Instrument Risks Status 5 4 PSM F8 3 PS F9 Likelihood of Occurrence (probability) 2 P P P P P F6 F1 F2 F5 F7 CS P P CS CS F3 F13 F10 F12 F11 1 1 2 3 4 5 Consequence of Occurrence (Impact) Mitigation Plans in Place for All FIELDS Risks
FIELDS Phase B Risks Mitigation • FIELDS Risk Mitigation activities for Phase B include: • Antenna Qualification: • Nb materials testing, optical props aging (~Feb to Apr ‘12 TBR(was 3/12), MSFC or EMTL(was Odeillo, France)) • Antenna model thermal testing (~Oct ‘12 to Jan ‘13 (was 3/13), Odeillo, France) • Additional contingency test, if needed (~Oct ‘13, Odeillo, France) • SCM / MAG / FGM Trade: • Determine the optimal technical (dynamic range) & resource (mass and thermal) solution (close by 4/12) • See Trades Slide for additional information. • MAG Performance Over Temperature: • MAG Cold Operations Test (~1/13) • MAG Thermal Cycling Test (end of Phase B) • MAG/SCM Interference: • MAG/SCM Interference test (similar to the MAG/FGM test performed in 7/11) (~5/12 TBR (was 4/13), Chambon, France) • Blue = change since MDR
F1-P:Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F2-P: Risk Burn Down 25 20 Risk Grade 15 10 5 A Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F3-CS: Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C D E Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F5-P: Risk Burn Down 25 20 Risk Grade 15 C 10 5 AB D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F6-P: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F7-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F8-PSM: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F9-FS: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F10-PS: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F11-S: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F12-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion
F13-P: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion