OPERATIONAL RANGE ASSESSMENT PLAN. Mr. Adam Cooper Environmental Range Initiatives Office of the Air Force Civil Engineer February 2006. PURPOSE. Status Intent Details Implementation. STATUS.

meira
Télécharger la présentation

OPERATIONAL RANGE ASSESSMENT PLAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPERATIONAL RANGE ASSESSMENT PLAN Mr. Adam CooperEnvironmental Range InitiativesOffice of the Air Force Civil Engineer February 2006

  2. PURPOSE • Status • Intent • Details • Implementation

  3. STATUS • AF Deputy Civil Engineer signed tasking letter requiring Operational range assessments to be conducted at all Air Force Operational Ranges • AF Operational Range Assessment Plan (ORAP) is complete • Three pilot assessments have been conducted and completed • Decentralized execution to begin in FY06

  4. INTENT The Air Force is committed to sustaining its operational test and training ranges. Operational range assessments are a range management tool that supports range sustainability.

  5. ORAP DETAILS – PRIORITIZATION • Prioritization • AF Operational ranges owned, operated, leased or withdrawn • Ranges not Included: • Small arms ranges assessed under compliance programs equivalent to the ORAP • Indoor ranges / recreational ranges due to definition • Tier 1 (Sep 08): CONUS air-to-ground ranges • Tier 2 (Sep 10): Overseas air-to-ground ranges, stand-alone EOD ranges, grenade ranges, etc. • Tier 3 (Sep 12): Small arms ranges

  6. ORAP DETAILS – MUNITIONS CONSTITUENTS ORAP list of munitions constituents includes: 1,3,5-Trinitrobenzene 1,3-Dinitrobenzene 2,4,6-Trinitrotoluent (TNT) 2,4-diamino-6-nitrotoluene 2,6-diamino-4-nitrotoluene 2,4-Dinitrotoluene (2,4-DNT) 2,6-Dinitrotoluene (2,6-DNT) 2-Amino-4,6-dinitrotoluene 4-Amino-2,6-dinitrotoluene 2-Nitrotoluene 3-Nitrotoluene 4-Nitrotoluene Hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) Methyl-2,4,6-trinitorphenylnitramine, (Tetryl) Nitrobenzene Nitrocellulose (NC) Nitroglycerin (NG) Nitroguanidine Octahydro-1,3,5,7-tetranitro-1,3,5,7-tetrazocine (HMX) Perchlorate Pentaerythritol tetranitrate (PETN) Chromium Lead White Phosphorus List will be modified (MCs added or removed) on a site-by-site basis based on the DQO process

  7. ORAP DETAILS – Conceptual Site Model One programmatic study question: • Is there migration / threat of migration of munitions constituents of concern from an operational range to an off-range area that poses an unacceptable risk to human health or the environment Qualitative Phase – develop a CSM from existing records • If CSM is complete, and no source / receptor interaction identified, qualitative assessment report produced. • If data gaps exist in CSM, additional information will be sought. Sampling plan will be developed in addition to the qualitative assessment report. Quantitative Phase – gather additional data • Conduct sampling to fill-in CSM data gaps • Quantitative assessment report summarizing all activities conducted produced.

  8. ORAP DETAILS – QUALITATIVE PHASE • Range-wide, Conceptual Site Model, designed to focus qualitative assessment on potential exposure pathways. • Sources: How do we expect contamination to be released? Where do these conditions exist? • Receptors: Humans in proximity to potential transport/exposure medium (Based on existing EPA guidance for receptor identification). • Pathways: Viable conduitfor contamination to move to thereceptor

  9. Sentry Arc Groundwater gradient Sampling point 75% 25% X Source ORAP DETAILS – QUANTITATIVE PHASE If source/receptor interaction identified during qualitative assessment: • Conduct Quantitative Assessment • Focus on potential exposure pathways • Source/receptor/pathway specific • Sampling focused along sentry arcs

  10. ORAP DETAILS – RELEASE/RESPONSE • Qualitative Assessment results = no source-receptor interaction: • Assessment report prepared, process documented • Reassess in 5 years or sooner • Qualitative Assessment results = completed source-receptor interaction: • Quantitative Assessment conducted to better understand if MCs are truly migrating • If MC Migration is identified: • Assessment report prepared, process documented • Respond to MC Migration through an existing AF environmental response program as appropriate

  11. ORAP DETAILS – REPORTING • Internal • Upon finalization, assessment reports sent to the MAJCOM • HQ USAF/ILEV reports annually on program status to OSD. • External • Wing Commander will inform the regulators in accordance with NCP and other applicable state and federal laws. • Upon completion of the assessment, final reports are made available to the public. Contractor Performing Assessment Installation / Range Wing Commander MAJCOM

  12. ORAP IMPLEMENTATION • Distribution to MAJCOMs for FY06-08 execution • Pilot-tests complete • Warren Grove, NJ / UTTR, UT / BMGR, AZ • HQ AF programmed to complete 9 additional assessments in FY06 • MAJCOM execution subject to funding availability

  13. United States Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e