Integrated Energy Design

Integrated Energy Design. Presentation of the IEE – INTEND project Green and Connected Cities. Strasbourg 10. December 2009. Mr. Per F. Jørgensen Senior partner KanEnergi AS. KanEnergi AS, Hoffsvn.13, N-0275 Oslo, tel: +47 22065750. www.kanenergi.com.

Télécharger la présentation

Integrated Energy Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Energy Design Presentationofthe IEE – INTEND project Green and ConnectedCities • Strasbourg 10. December 2009 • Mr. Per F. Jørgensen Senior partner KanEnergi AS KanEnergi AS, Hoffsvn.13, N-0275 Oslo, tel: +47 22065750. www.kanenergi.com Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  2. The INTEND project2007-2009 Supported by • Partners: • KanEnergi AS coordinator - NO • Green Building Alliance – NO • Esbensen ConsultingEngineers AS – DK • Engineering College of Aarhus – DK • NAPE – PL • London Metropolitan University – UK • University of Athens – GR • Austrian Energy Agency - AT Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  3. VisionoftheINTENDproject • To develop Integrated Energy Design (IED) as a standard European practice of building design • and set a standard, which is substantially beyond the level of the Directive of Energy Performance of Buildings (EPBD) Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  4. What is INTEND ? European projectsupported by IEE INTegratedEnergy Design in publicbuildings Target group: thewhole building sector The methodedescribed in thedeveloped guideline is alsosuitable for sustainable urban planning Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  5. Why IED? Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  6. Main resultsoftheINTENDproject • 14 ”IED”-buildings in Europe • Guidelines ofIED • European database ofsustainableprojectswww.ecoarchwiki.net • Information and trainingofcore target groups • International conferenceon IED More info at www.intendesign.com Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  7. to be downloaded at www.intendesign.com The guideline – 9 steps STEP 1 - select a multi-disaplinary design team from day 1 STEP 2 - analyse theboundaryconditions STEP 3 - make a Quality Assurance Program and qualitycontrol plan STEP 4 - arrange a kick-off workshop STEP 5 - facilitateclosecooperationwithinthe design team STEP 6 - updatethecontol plan and documenttheenergyperformence STEP 7 - make contracts that encourage energy efficiency STEP 8 - motivate and educate construction workers and apply quality tests STEP 9 - make a user manual of operation and maintenance Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU

  8. Thankyou for yourattention! • pfj@kanenergi.no • www.intendesign.com Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU