Task Force # 13 Presentation

Task Force # 13 Presentation. MISSION. MEMBERS. BRIAN CIAPPARA HOUSHANG ESMAILI DEREK FLIESS TIMOTHY HATFIELD NIXON LAM HUMPHREY LOE GREG McCARTHY SAM MEHTA * MELBA YEE. Mission: Achieve Carbon Neutrality for SFO Controlled Operations . SFO BASELINE CARBON FOOTPRINT IN FY 2009 .

melosa
Télécharger la présentation

Task Force # 13 Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task Force # 13 Presentation MISSION MEMBERS BRIAN CIAPPARA HOUSHANG ESMAILI DEREK FLIESS TIMOTHY HATFIELD NIXON LAM HUMPHREY LOE GREG McCARTHY SAM MEHTA * MELBA YEE • Mission: Achieve Carbon Neutrality for SFO Controlled Operations

  2. SFO BASELINE CARBON FOOTPRINT IN FY 2009

  3. IMPACT OF GHG EMISSION OFFSET MEASURES IN FY2009

  4. COMPARISON EMISSION EMISSION REDUCTIONS 7% DUE TO ENERGY SAVINGS 91% INDIRECT REDUCTION 2% RENEWABLE • 86% IS DUE TO ENERGY CONSUMPTION • 14% OTHER

  5. GHG REDUCTION STRATEGY How about a $10,000 sandwich? • IMPROVE ENERGY EFFCIENCY • NEW EQUIPMENT, GREEN VEHICLES • RESOURCE CONSERVATION • OPERATION PRACTICES • INFLUENCE STAKEHOLDERS –PUBLIC,TENANTS,CONTRACTORS,SERVICE PROVIDERS • RENWABLE ENERGY - SOLAR Bottled water costs about 2000 times more than tap water.5 Can you imagine paying 2000 times the price of anything else?

  6. SHORT TERM GHG REDUCTION MEASURES • Achieve 75% Solid Waste Recycling • Complete PC Air Installation at B/A B&E and at T2 • Complete Ongoing Lighting Efficiency Projects • Continue Fleet Vehicle Replacement Program • Measure Fugitive Refrigerant Gas Losses • Other Measures: Green Car Rental and Carbon Kiosks Goal: Achieve Carbon Neutrality by July 2011 -- 9 MONTHS AWAY ….. IF

  7. THEN WHAT? • THIS IS A CONTINUOUS PROCESS THAT WILL HAVE TO BE MONITORED, UPDATED AND MODIFIED TO CONTINUE TO MEET THE GOAL OF CARBON NEUTRALITY

  8. IT WILL REQUIRE • MANAGEMENT COMMITMENT • POLICY CHANGES • RESOURCES • STAKEHOLDER BUYIN AND PARTICIPATION • EDUCATION AND ENCOURAGEMENT

  9. Medium and Long Term Recommendations • Continue Lighting Efficiency Measures • Install Additional Solar Panels with SFPUC Funding • Replace an Outdated Chiller Unit at the Central Plant • Replace Outdated T3 Fan Room Equipment • Procure More Efficient Hybrid and Electric Vehicles • Reduce Vehicle Idling Time through Employee Education

  10. Medium and Long Term Recommendations (Continued) • Install Computer Sleep Mode Software • Replace Desktop Computers with Laptops • Develop a Data Warehouse at SFO • Erect a Greenhouse over Biosolids Drying Beds • Obtain O&M LEED Certification for Terminal Complex • Develop O&M Plan for Terminal Complex

  11. OTHER LONG TERM GHG EMISSION REDUCTION MEASURES • Further Improve the Efficiency of Terminal Complex HVAC System • Improve HVAC System Efficiency in other SFO Buildings • Further Reduce Fuel Consumption at SFO • Evaluate Digester Gas Reuse Options • Further Enhance Solid Waste Recycling • Minimize Refrigerant Gas Emissions

  12. INFLUENCE STAKEHOLDERS • GREEN RENTAL CARS • SUSTAINABLE FOOD • CARBON KIOSKS • GREEN CONTRACTORS • GREEN TENANTS

  13. Chiller #2 – Installed in 1978

  14. Existing supply fan in B/A E.  Installed 1978. It is about seven feet tall and perhaps ten feet long.  This one fan serves half the boarding area  If it fails, then half the boarding area is without ventilation until the unit is repaired.  For a catastrophic failure, it could be at least a week of no ventilation.

  15. Fan Wall Fans like those installed in T2.  Typically these box fans (3 ft by 3 ft) are in arrays of 3 by 3 (or 4 by 4).  If one fan fails, the others pick up the load and supply normal ventilation.  They are run by a VFD to maintain all fans at a uniform speed to maintain static  pressure at setpoint.