1 / 11

Reporting Procedure

Reporting Procedure. Gints Pīpiķis Joint Technical Secretariat. Lead Partner Seminar 15 October 2009, Siauliai. Reporting: Legal Framework. Programme Manual Subsidy Contract (reporting deadlines) National Eligibility Rules

melvyn
Télécharger la présentation

Reporting Procedure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ReportingProcedure Gints Pīpiķis Joint Technical Secretariat Lead Partner Seminar 15 October 2009, Siauliai

  2. Reporting: Legal Framework • Programme Manual • Subsidy Contract (reporting deadlines) • National Eligibility Rules • Guidelines for First Level Controllers, (FLC confirmation, Partner report form, Certificate of Proficiency, Validation on Cost Sharing) • FLC guidelines for PP and LP Which ever rule is stricter - applies!

  3. National Eligibility Rules

  4. First level control system The first level control (FLC) implies 100% checks of the project expenditure for each project partner that are carried as desk checks and on-the-spot checks Lithuania: LT partners will have to select external auditor using public procurement procedure following Requirements for FLC (www.latlit.eu,www.esbendradarbiavimas.lt) Latvia Centralized FLC system : State Regional Development Agency / Territorial Cooperation Project Control Department

  5. Reporting Procedure • Six-months Reporting Periods (RP): • PP sends to FLC Partner Reports: 10 days after end of RP • LP submits filled Progress Report to FLC 2 weeks (latest) before deadline for submission to JTS • In 3 months after end of RP the LP submits Progress Report to JTS • November 1–April 30 • May 1–October 31

  6. Reporting Procedure

  7. Pre-filled Reporting Form Within 3 months after the end of Reporting Period Progress Report Payment Preparation of payment CA Reporting/ Payment Procedure Project Partners JTS Lead Partner 1 month (latest) before the end of Reporting Period PP 1 PP 2 Clarification Max 6 months after submission Check of PR Answers PP 3 Payment Notification Letter After all open questions are clarified

  8. Reporting Procedure LP sends the following documents to the JTS: • Original Certificate of Proficiency of the LP Controller • Copies of Confirmations of all the PPs controllers • Verified Progress Report • Signed by LP and FLC • In electronic and paper version • In English • Supporting documents : • Events documents (e.g. agenda, list of participants with signatures for each day, photos, see full list in PM, 10.1.2); • Copies of outputs produced (e.g. studies, press articles, leaflets, pictures of infrastructure, etc.)

  9. Forms

  10. Forms • Forms: • JTS sends out a pre-filled Progress Report form to LP • Partner report, timesheet, list of participants form available as attachment to FLC guidelines

  11. Forms • Time sheet & list of participants