An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Marine Well Containment Company Astley Blair Chief Financial Officer January 25, 2012

  2. Our Commitment • Continuously ready to respond to a well control incident in the deepwater U.S. Gulf of Mexico • Continuously advancing deepwater well containment in the U.S. Gulf of Mexico • Recognized and respected leader in deepwater well containment in the U.S. Gulf of Mexico 2 MWCC – Confidential

  3. About Our Company • Leading deepwater well containment system and technology provider for U.S. Gulf of Mexico • Expertise in subsea containment and incident response training • Independent, not-for-profit company • 10 members, representing 70% of the deepwater wells drilled from 2007-2009 • Each member has an equal share and an equal vote • Investment of over $1 billion in system • System available to all operators in the U.S. Gulf of Mexico as a member or as a non-member (per well basis) • Industry Recognition • Finalist for 2011 Platts Energy Awards for “Industry Leadership” • Recipient of LMOGA Blue Herron award 3 MWCC – Confidential

  4. Key Accomplishments • Interim Containment System ready to go since February 2011 • All equipment transferred and housed at ASCO shipyard in Houston • Capping stack ready for 10,000 ft and TLP/SPARs response plan developed • Naming ceremony for “Eagle Texas” Modular Capture Vessel in Japan • Aframax tanker conversion has commenced in Dubai • Headquarters opened with all processes up and running • 2012 budgets approved by Members • Developed, documented and implemented a set of accounting procedures covering the accounting and reporting functions. • Some are system-centric and require updating for our move to SAP • MWCC is on SAP now. Ran parallel from August through October. November was our first stand-alone month. • UHY was selected as MWCC’s independent auditors. • 31 permits granted by BSEE, including 1 non-member • Incident Response Training: • Completed 8 member simulation exercises, including successful BSEE unannounced drill • More than 2,000 hours of Incident Preparedness & Response training delivered • Deployment tactical plans well developed; generic procedures available 4 MWCC – Confidential

  5. MWCC Containment System Roles • MWCC • Maintain containment system in ready state • Deliver capping stack and subsea components to RP shorebase • Maintain mutual aid inventory list • Provide advice on operation of MWCC capping stack and other containment equipment • Provide on-going training to members and contracted parties • Covered Entity • (Responsible Party - RP) • Direct and manage containment response (with Unified Command) • Remove debris • Provide marine vessels (through mutual aid) to capture oil • Install capping stack and subsea components • Return capping stack and subsea equipment to MWCC upon completion 5 MWCC – Confidential

  6. Containment Systems Overview Interim Containment System (ICS) 15,000 psi 18 ¾ in 10,000 ft 8,000 ft 60,000 120 Expanded Containment System (ECS) 15,000 psi 18 ¾ in 10,000 ft 10,000 ft 100,000 200 System*: PSI: Bore: Depth Cap Only: Depth Cap and Flow: Fluid BPD: Gas MMCFD: Umbilical Riser Subsea Containment Assembly Accumulator Unit Manifold Dispersant Fluid System *System offered as a total package; individual elements not available on a stand-alone basis 6 MWCC – Confidential

  7. 2012 Priorities • Continuously advance MWCC’s service offering to keep pace with members’ needs • Enhance Containment System readiness (e.g. member drills) • Prepare for and accept Enhanced Containment System (operations, technology, response ready, and permitting process) • Continue to evolve incident preparedness and readiness training with members to enhance tactical planning • Continue to attract and motivate quality talent to maintain a high-performing organization 7 MWCC – Confidential

  8. Q & A