1 / 3

Lawrence Berkeley National Laboratory ASO Internal Safety Review System

Lawrence Berkeley National Laboratory ASO Internal Safety Review System. Triennial Safety Review codified in institutional procedure concurred to by LBNL Radiation Safety Committee (RSC) and maintained by Radiation Protection Group in LBNL EH&S Review may be modular or a single process

Télécharger la présentation

Lawrence Berkeley National Laboratory ASO Internal Safety Review System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lawrence Berkeley National Laboratory ASO Internal Safety Review System • Triennial Safety Review codified in institutional procedure concurred to by LBNL Radiation Safety Committee (RSC) and maintained by Radiation Protection Group in LBNL EH&S • Review may be modular or a single process • Accelerator program division (e.g. ALS) is responsible for developing the plan, suggesting team members (internal and external) and presenting this to the RCM & RSC for approval • Institutional sub-committee of RSC established to ensure review meets ASO requirements

  2. Lawrence Berkeley National Laboratory ASO Internal Safety Review System • Accelerator program division conducts the review and documents any findings • A corrective action plan is developed to close any findings • CAP reviewed and ultimately approved by institutional committee • RCM may restrict accelerator operations based on results of review • Continued renewal of accelerator authorization to operate (RWA) contingent on completion of triennial safety review

  3. Lawrence Berkeley National Laboratory ASO Internal Safety Review System • LBNL ASO assurance procedure developed in 2007 – currently in revision • All safety reviews to-date have been integrated into periodic review of accelerator RWAs or internal to accelerator program divisions in areas outside purview of RWA (e.g. SSQA) • Currently developing 420.2B-compliant SADs • DOE approval of 88” Cyclotron SAD/ASE expected September 2009 • First triennial safety review to LBNL ASO assurance procedure – September 2012 (?)

More Related