An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress in the first year of NORS De Mazière Martine, Hocke Klemens, Richter Andreas, Godin-Beekmann Sophie, Henne Stephan, Blumenstock Thomas, Niemeijer Sander, Mahieu Emmanuel and participating teams and SC members

  2. Connections with GAS, ESA, NDACC, WMO/GAW The composition of the Steering Committee is as follows: • the Project Management Team (coordinator and WP leaders); • representative of MACC-II: R. Engelen • a representative of ESA for the GECA environment: T. Fehr/B. Bojkov; • a representative of EEA for the coordination of the in-situ component in the GMES Atmosphere area: H. Steen-Andersen • G. Braathen (WMO), as co-chairman for NDACC; • O. Tarasova, responsible at WMO for matters related to Greenhouse gases, Reactive gases, GAW stations and QA/QC; • J.C. Lambert, as representative of CEOS WGCV

  3. Reminder about NORS • EU FP7 project • Start: Nov. 1, 2011 • Duration: 33 months • Objective: • Toperform the required research and developments for optimizing the NDACC data for the purpose of supporting the quality assessments of the future GMES Atmospheric Service (GAS  MACC-II ) • To develop and implement a Web-based Validation Server of the MACC-II (GAS) products using the NORS data products

  4. Demonstration Capacity building

  5. NORS data products & techniques • Target NORS data products • tropospheric and stratospheric ozone columns and vertical profiles up to 70 km altitude • tropospheric and stratospheric NO2 columns and profiles • lower tropospheric profiles of NO2, HCHO, aerosol extinction • tropospheric and stratospheric columns of CO • tropospheric and stratospheric columns of CH4 • 4 NDACC observation techniques + in-situ surface monitoring: Lidar, MicroWave, FTIR, UV-VIS DOAS + in-situ surface monitoring

  6. Progress (1/2) • NORS data willbe HDF formatted, accordingto GEOMS guidelines (http://avdc.nasa.gsfc.gov/GEOMS) and NDACC instruments templates (tobefixedasap) • Rapid data delivery system is set up: AllNORS data willbesubmittedwithin 1 monthafteracquisitionto ‘NRT’ section of NDACC database (ftp://ftp.cpc.ncep.noaa.gov/ndacc/NRT/) ** • Data access is public • Information about the NORS project and results is available on the NORS Webpage: http://nors.aeronomie.be

  7. Progress (2/2): integrated products • WP6:development of a methodology for integrating ground-based data sources to provide consistent ozone vertical distribution time series as well as tropospheric and stratospheric ozone columns at the 4 NDACC stations (NyAlesund, Alpine station (OHP), Izaña, La Réunion) • 1st steps: At Alpine station (OHP, Jungfraujochand Bern): • evaluation of validity ranges for different data sources (DIAL, FTIR, microwave); • comparisons of monthlymeanprofilestoidentifyandunderstandbiases • Next steps: Look at individualprofilesandairmassvariations • WP5: startedwork on integration of surface in-situ, gb remote-sensingandsatellite data

  8. NORS Validation Server (NVS) • Goal: Web-based server for validation of GAS products using NORS data products • System implementation: currently ongoing at S&T • System delivery: medio 2013, deployed at BIRA • WP progress/deliverables since NORS Kick-off: • May 2012: User Requirements Document • July 2012: Server Design Document NORS partners workcloselytogetherwith the MACC-II consortium, and in particularwith the MACC-II VAL project

  9. NVS User Requirements • Identification of NORS user categories: • MACC-II data originators, MACC-II VAL subproject, NORS (NDACC) data providers,MACC-II users • Description of desired NORS products and MACC-II models • Description of intercomparison validation chain and its parameters • Description of server outputs (statistics, plots, data) • Definition of use cases: • Default = incremental, data-driven processing of products and generation of server outputs for fixed sets of parameter settings • Interactive = user provides custom parameter settings, triggering full report generation • VIP = user providing own model and/or NDACC data streams for custom report

  10. NVS Design

  11. NVS Design (cont.) • Server back-end retrieves model data from MACC, NORS data from NDACC; extracts and maintains metadata catalog • Arrival of new products triggers incremental validation process that generates database of intermediate results and outputs • Core validation chain algorithms built on top of an expanded GECA intercomparison set of command-line tools • Includes tools for NO2 diurnal correction (under development) and effective airmass calculations (already available for FTIR observations) • And others in future…. • Server provides web application front-end that supports all use cases: user can browse outputs, generate default reports, request custom reports

  12. NVS Summary • NVS will serve default users by generating automatically daily validation reports • NVS will serve other users in interactive mode • NVS will address the MACC-II products corresponding to the NORS target products, from the different MACC-II model outputs • The validation chain tools will be improved gradually. • NVS has been designed such as to enable expansion to more NDACC stations, more NDACC products, more model outputs. • NVS will be linked to MACC-II (and NDACC ?) Webpages

  13. NORS near- future • To start soon: • Minor revision of UV/VIS GEOMS templates (forincludingquality indicators relatedtocloudy scenes) • Fixing the LIDAR templates • Data User documentation • NDACC – TCCON (mid-IR versus near-IR) Cross-calibration of CO • bettercharacterisation of NORS data uncertainties Cf. ISSI Workshop on DIAL uncertainties Cf. Joint IRWG/NORS Workshop in Feb. 2013 • First progressand review meeting at BIRA, on Nov. 20-21

  14. Acknowledgements:This project has received funding from the European Community’s 7th Framework Programme (2007-2013) under grant agreement 284421

  15. ** Discussion • ‘NRT’  ‘RD’ or ‘Preliminary’ • DATA_QUALITY or DATA_CAVEATS

  16. Some GEOMS issues GEOMS Metadata Board revived: ESA and NILU, NASA AVDC, NDACC DHF, Ian Boyd, S&T, NORS coord. • Workingon ‘mapping’ between GEOMS & netCDF-CF • Workingon verifying compliance with ISO and INSPIRE standards • EVDC ESA Earth ObservationValidation Data Center • willbe made GEOMS compliant • Will bemaintainedfor TROPOMI andSentinels • willbesynchronisedwith AVDC for GEOMS guidelines • Work in different WGs on uncertaintyreportingtobestimulated