1 / 5

INTC matters

The INTC meeting held in October 2012 discussed approximately 800 HIE-ISOLDE shifts, with 30 proposals submitted, including MINIBALL, CD-only, T-REX, and others. A total of 429 shifts were accepted, reflecting the ongoing demand for low-energy experiments, which totaled 364.5 shifts. The committee seeks status reports from collaborations like COLLAPS and CRIS to monitor ongoing projects. Future proposals will be accepted in June and October 2013, with a focus on low-energy and HIE-ISOLDE initiatives. The aim is to enhance collaboration and optimize shift allocation.

millie
Télécharger la présentation

INTC matters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTC matters . • Magdalena Kowalska

  2. Oct 2012 meeting • Request for > 800 HIE-ISOLDE shifts • 30 proposals • MINIBALL + CD-only, + T-REX, + SPEDE (15) • HELIOS (5) • Scattering experiments (3) • Active target (2) • Si+ SAND (1) • 429 shifts accepted (about 200 REX schedule per year) • Most other proposals asked for clarification letters (so they’ll probably come back)

  3. Statistics – Oct 2012 number of institutes per country 81 344 number of physicists per country of their institute

  4. Shift status • Low-energy IS experiments (including WITCH): 364.5 shifts • Post-accelerated REX experiments: 216.5 shifts • HIE-ISOLDE shifts: 429 shifts

  5. Strategy • Ask low-energy collaborations for status reports (SR) and addenda (ADD): • 1 SR per collaboration, e.g. COLLAPS, CRIS, SSP, … • ADD for each IS experiment if more shifts needed than available • If no SR -> experiment closed, shifts at 0 • Ask REX experiments for status reports (SR) or addenda: • 1 SR or ADD per IS experiment • If no SR -> -> experiment closed, shifts at 0 • Timing: • June and October 2013 – INTC open to low-energy and HIE-ISOLDE proposals, LOIs, SR, addenda • January/February 2014 – only low-energy SR and ADD

More Related