An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction to TPMS Transit Presented by ICEA Service BureauBrandy Thomason, Steve De Vries November 18, 2010 http://www.tpms.org/transit/

  2. Overview • TPMS transit is an online tool for submitting and tracking information regarding transit investments • FA STIP • Entry, review and approval of transit program elements • Cross references with Highway Programs • Transit Grant administration • Set up and manage FA grants • Link projects and Grants to Transit Contracts • Transit contract administration • Track contracts from origination through completion • Tracks each individual project as well • Interlinked with DOT transit inventory

  3. Background • TPMS originated in 2002 as a tool for tracking LPA road, bridge and enhancement projects • Built by ICEA Service Bureau • Operated in partnership with Iowa DOT • Tracks County stuff, FA STIP stuff and projects in development • Inclusion of transit was discussed at the outset – but was deferred • DOT & ICEASB began reviewing Transit again in late 2008 • Those discussions led to concept development and production of transit modules in 2010 • Now ready to place into production • Available for use in FY12 programming

  4. Structure of the Transit module

  5. Geographic Overview FTA TA 1 TA 2 TA 3 Transit server TA 4 OPT PA

  6. Screen-scape 1 • Log-in • STIP program element listing • Add, update, delete, submit • Add: job creation screen (vehicle, investment or program) • Multi-function filtering system • Status settings • Project attributes • Action buttons (Submit / Reset / Approve)

  7. Screen-scape 2 [OPT work area] • Grant Management • Grant listing (add new grants) • Grant detail (add projects to a grant) (link projects to contracts) • Available projects list

  8. Screen-scape 3 • Project task records(As set in Setup) • Specifications • Bid solicitation • Or Equals response • Bids received rpt • Pre-award cert • Bid award • Delivery • Make Ready • Contract administration • Contract listing • Contract detail • Project details • Tabs • Setup • Status • Log • Files • Complete / Cancel

  9. Live demo - programming • Story line • TAx wants to program and develop several jobs • 1 Open TPMS transit • 2 Log in • 3 Review current program (either Approved or Draft) • 4 Create new elements to request funding of buses, capital improvements, operations or studies • 5 Submit to appropriate RPA or MPO • 6 Pour a cup of coffee while • PA review and approves • DOT responds • FTA responds

  10. Live demo – Grant management • Pour another cup of coffee and wait for OPT to get things set up • OPT actions • Gets notified that funds have been allocated • Set up grants under umbrella of funding programs • Your project(s) is/are inserted into one or more grant(s) • Define grants • Add projects • Link contracts

  11. Live demo – Contract admin • Open up OPT entered contract • Review overall status • Inspect Contract details (as set by OPT) • Projects covered by the contract • Update TA editable items • Set preliminary State settings • Fill in project data detail boxes • OPT can also set States and details – and has final control over the records

  12. Implementation schedule • What’s in place right now? • Approved FY11 and draft FY12 program records in place • FY 11 is loaded and locked • FY 12 is ready for next prepare, submit, review and approve cycle. (Already contains initial record set) • Grant management • Ready for OPT to entry new grants at appropriate time • Contract admin • Currently empty • Will come into use after FY12 program has been FTA post-approved

  13. Instructions • Brandy will be developing a set of instructions • Will be based on annotated screen captures • Will serve as a ‘look-it-up’ reference more than as step by step directions • Will be available in December • Training sessions – via GotoMeeting– will be scheduled in December? January? We need your feedback on when to do this.

  14. Log in info • Available from Pam http://www.tpms.org/transit/

  15. User support • When you have questions or run into problems, please get in touch. • We can often fix things while you are on the phone or within half an hour of learning of the issue. • 515-244-0779 • brandy@iceasb.org, steve@iceasb.org