An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DØ SMT Status Report Schedule D0 PMG, May 04, 2000

  2. Ladder and Wedge Production • Axial detectors (3-chip): • Ladders being retrofitted due to grounding problem • Finishing last few ladders needed • 2o detectors (9-chip): • Production paced by HDI availability • can restart at >8/week when HDIs received • Sensor supply not pacing production, original order complete this month • Overall supply of +2 deg. after yield may fall short • 50 additional wafers entered into system for reorder • Fallback for spares: • use sensors with higher bias resistance • 90o detectors (6-chip): • 87(/144) sensors built so far • Paced by Micron delivery, 13 delivered in so far in May • F Wedges (14-chip): • Production in progress, paced by testing • Micron order complete, ~18 spare on shelf • Eurisys order is late. • Waiting for 25 sensors to clear customs • Next batch this month • H Wedges (6-chip): • ~180 half wedges produced to date • Sensor delivery on schedule • Glued 25 full wedges of which ~15 grade A • changed encapsulant to more flexible material to avoid stresses on bonds • Concentrating on full wedge production and disk assembly D0 PMG, May 04, 2000

  3. High Density Interconnect (HDI) • 9-chip hdi’s • All Be pieces needed received. • 37 (34 + 3) hdi’s sent to Promex for stuffing • 10 passed - ladders built • 27 developed surface bubbles: • 23 now repaired and are under test, 4 not recovered • 40 HDIs at now Promex for assembly • 34 flex circuits still needed from Compunetics • pacing 9 chip ladder production • F-wedge HDI’s • All components for HDI’s in hand: Be, jumpers, flex • 23 HDI’s at Fermilab for wedge production • 50 recently stuffed under test • 26 HDI’s at Promex • H-wedge hdi’s • All flex in hand • 60 being laminated • 30 received from Silitronics; 20 at Fermilab D0 PMG, May 04, 2000

  4. Production Status D0 PMG, May 04, 2000

  5. Production Status for first half cylinder • All detectors for 1st 1/2 cylinder produced • not all tested, but OK assuming yields hold up • 4 flavors of 9-chip ladders; current status: “short tails” D0 PMG, May 04, 2000

  6. Barrel / Disk Assembly Barrels • 69/72 ladders installed in first barrel • May have to reground some ladders • Installation of ladders for second barrel started; 6 installed ladder installation radially outward. F Disks • First ring assembled ~5/10/2000 • Oversight on cable placement, need to reinstall some wedges • Behind schedule, but lag can be made up rapidly H Disks • Installed 4 wedges on first ring, pORC needed • CMM programming and use of rotary table understood • Mechanical assembly of first ring in the next few weeks. • Not a schedule issue Assembly • Half cylinder cut • cable cut-outs being made at outside (water jet) shop • Preparing for fit-up of H disk supports in Sci-Fi Note: We haved changed our plans from the original schedule which assumed immediate integration of the 1st barrel/disk module - we will perform readout separately D0 PMG, May 04, 2000

  7. Readout and Cabling Readout • Readout system being prepared for full readout of barrel / disk assembly • Start with 1st F ring (rather than barrel) • Need pORC ~ next week • First test with full assembly and cooling • Channels read out limited by interface card supply, have 4, hope for 15 in June • Supply of cards for 1st half cylinder installation and testing will be insufficient, increase pre-production number? Low Mass Cables • Low mass cables must be installed before move to D0. • Cable production data from Honeywell : • 820 cables started, 166 produced, 360 needed for first 1/2 cylinder (including spares) • delivery expected at 56/week • ~4 week post processing and testing • First half cylinder done ~ end of July • Cables may be pacing item in delivery to D0, watch carefully D0 PMG, May 04, 2000