html5-img
1 / 6

TAS Study Work Group November 28 th 2007

TAS Study Work Group November 28 th 2007. Presentation to TEPPC - TAS Robert Stade – TASSWG Chair. TAS Study Overview. Study Status & Plan for Completion Incremental Resources - Approval Item 2008 Schedule Work Group Report. I. Study Status & Plan for Completion. Process Study Plan

misu
Télécharger la présentation

TAS Study Work Group November 28 th 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TAS Study Work GroupNovember 28th 2007 Presentation to TEPPC - TAS Robert Stade – TASSWG Chair

  2. TAS Study Overview • Study Status & Plan for Completion • Incremental Resources - Approval Item • 2008 Schedule • Work Group Report

  3. I. Study Status & Plan for Completion Process Study Plan • Jan 18 – Apr 17: Wrote Draft Study Plan • May 1: TAS Approval • May 18: TEPPC Approval Study Conclusion • Nov 27: Progress Overview • Nov 30: Final definition of the hypothetical resource portfolios for the Transmission Expansion Cases • Dec 31: Completion of the Transmission Expansion Cases • Jan 31: Completion of the Annual Report (caveat) Study Update • Apr 2008: Update Study Plan (living document) as required

  4. II. Incremental Resources • Generation – Tom Carr - Approval Item • Sub Work Group • Held 6 meetings • Up to 16 participants per call • Development Steps • Developed methodology to identify mix of incremental generation resources 2008-2017. Researched and identified RPS legal requirements from 9 states with RPS (AZ, CA, CO, MT, NV, NM, OR, TX, WA) • Constructed spreadsheet that derives RPS generation energy (MWh) for 2017 • Process • Started with existing Load & Resource data • Used IRP data to identify future generation • Cross referenced with resources in TEPPC data base • Identified renewable RPS • Identified different generation types • Verified name plate capacity • Perform gap analysis • Other incremental resources • Transmission Update– Donald Davies • Stakeholder findings of TECC data base

  5. III. 2008 Study • From 2007 Study Results • Investigate cases for transmission needs from incremental resources • Learn from first case studies, document and take forward • Develop timeline for report to meet Order 890 requirements • Revise Incremental Resources • Move forward with Class 1 & 2 generation • Add Western climate GHG • Check state statues • Transmission • Determine how competing alternatives will be handled • Revise Nomograms based upon project additions • Develop operating limit guidelines

  6. Questions ? robert.stade@us.ngrid.com Phone: 801-328-2169

More Related