An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bubble Chamber Planning Meeting 04 September 2013

  2. Agenda • Bubble Chamber progress at Argonne • Superheated Liquids to be used in the experiment • Beamline Layout • Bubble Chamber cost estimate: procurement and labor • Error Analysis

  3. Superheated Liquids • List of superheated liquids to be used in the experiment: • Readout: • Digital Camera • Need Acoustic Signal to discriminate between (γ,α) and (γ,n) events

  4. Beamline Layout • Will not install BPM on Spectrometer line • 2 Super Harps to measure beam profile and absolute beam position (no need for Quads) • Fast Valve to protect from vacuum failure: on our beamline or just in front of ¼ Cryo-unit • Do we want vacuum pipe to connect vacuum window to chamber? • Beam Properties at Radiator:

  5. 81” Or in front of ¼ Cryo-unit Electron Dump 42” Fast Valve 25° Radiator Viewer Ion Pump 25° Super HARP Viewer BPM Bubble Chamber BPM Super HARP Valve Cu Collimator Sweep Dipole Corrector Photon Dump Corrector Ion Pump Faraday Cup Vacuum Window 55” 35” 92” 100”

  6. Cost Estimate • Radiator motion and Sweep Dipole must be in FSD • BCM0L02 and Electron Dump in Beam Loss Accounting (BLA) • New beamline components: 2 Super Harps + Fast Valve • Summary of labor cost by group: