1 / 1

GOES-RRR/AWG ‘Critical Path’ Milestones

GOES-RRR/AWG ‘Critical Path’ Milestones. FY09 Complete study of ABI-like AMVs using SEVERI data (heritage channels). - Continue comparison/validation studies of simulated GOES-R AMVs produced by GEOCAT (GOES-R) and WINDCO (existing) - Add Visible and SWIR channel(s)

Télécharger la présentation

GOES-RRR/AWG ‘Critical Path’ Milestones

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GOES-RRR/AWG ‘Critical Path’ Milestones • FY09 • Complete study of ABI-like AMVs using SEVERI data (heritage channels). - Continue comparison/validation studies of simulated GOES-R AMVs produced by GEOCAT (GOES-R) and WINDCO (existing) - Add Visible and SWIR channel(s) • Complete GRAFIIR studies to document the sensitivity of various noise effects on AMVs • Initial demo of potential AMVs from non-heritage spectral bands - ABI Channels 9-13 (WV, Ozone, IR) • Update ATBD with new science results

More Related