An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manchester United Soccer Club Rock Rimmon Soccer Complex Expansion Plans Darren Hamilton

  2. Outline • Current status • Requirements • Constraints • Resources • Responsibilities • Timeframe • Costs • Return on Investment • Tracking

  3. Manchester United Soccer Club • Located in Manchester, New Hampshire • Training facility for young athletes • 24 boys and girls, ranging from 9 to 16 years of age • Owns Rock Rimmon Soccer complex

  4. Summer Tournament • Manchester United Soccer Club wants to host a summer tournament • Possible revenue of $50,000-$70,000/Year • Current complex consists of 3 fields • Complex needs 2 additional fields to host tournament • Existing fields need refurbished • Funding needed for scholarship program

  5. Current Situation • Nicolette Larson voted tournament director • First meeting was not productive • Few useful ideas were generated • Conversations got off track • Discussions resulted in arguments

  6. Work Breakdown Structure

  7. Plan for moving ahead • Determine scope statement of project • Create organizational breakdown structure • Estimate times, costs, and resources needed • Create a project plan • Approval • Execute through completion

  8. Constraints and Resources • Constraints • Limited Time • Project Funding • People, Materials, Equipment • Resources • Funding • Apparel Design • Apparel Production

  9. Resources Cont. • Survey • Blueprints • Development • Turf contractors and supplies • Electricians and lighting • Landscapers to refurbish existing fields • Contractor to install field dressing

  10. Responsibility Matrix

  11. Responsibility Matrix Cont.

  12. Schedule • Fall • Survey and blueprints for new fields • Develop land for new fields • Design and obtain manufacturer for clothing • Begin refurbish of existing fields • Raise funds

  13. Schedule Cont. • Spring • Replace equipment on existing fields • Lay turf on new fields • Install Lights • Install new equipment • Continue fund raising

  14. Costs

  15. Return on investment • Total Cost = $1,672,500 • Partner with other organizations to reduce cost by 40% = $1,003,500 • Annual income of $210,000 • $1,003,500/$210,000 = Complex paid off in 4.8 years.

  16. Risk Assessment

  17. Risk Assessment Cont.

  18. Project Tracking • Tracking Gantt chart • Cost Performance Index • Microsoft Project • Status update meetings

  19. Conclusions • Project should move ahead! • Questions?