1 / 34

2009 TDM Summit November 16 th , 2009

Planning for Mobility Hubs. Joshua Engel-Yan Transportation Policy and Planning Metrolinx. 2009 TDM Summit November 16 th , 2009. Outline . The Big Move – the Regional Transportation Plan What are Mobility Hubs? Kipling mobility hub planning Lessons learned. Metrolinx Mission.

mona-ortiz
Télécharger la présentation

2009 TDM Summit November 16 th , 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning for Mobility Hubs Joshua Engel-Yan Transportation Policy and Planning Metrolinx 2009 TDM Summit November 16th, 2009

  2. Outline • The Big Move – the Regional Transportation Plan • What are Mobility Hubs? • Kipling mobility hub planning • Lessons learned

  3. Metrolinx Mission Deliver rapid transit improvement Make up for lost generation of rapid transit investment Lay foundation for long-term sustainable strategy of investment in rapid transit 3

  4. 6 million people today 8.62 million people by 2031 30 municipalities 4 levels of gov’t 10 transit agencies 8,242 km2 Geographical Context

  5. Provincial Policy Context • Places to Grow legislation • Management of future growth to 2031 • 25 Urban Growth Centres • Density targets to encourage revitalization as vibrant, transit-oriented nodes • Protects 1.8 million acres of sensitive land from development for: • water and air • local food production • recreation opportunities, incl. trails and parks

  6. A Bold Plan 6

  7. The Big Move Regional transit service will double Transit lines will triple in length Despite growth, commuting times do not increase 7

  8. Mode Share

  9. 9 Big Moves 1 A fast, frequent and expanded regional rapid transit network 2 High-order transit connectivity to the Pearson Airport District from all directions 3 An expanded Union Station - the heart of the GTHA’s transportation system. 4 A complete walking and cycling network with bike-sharing programs 5 An information system for travellers, where and when they need it 6 A region-wide integrated transit fare system 7 A system of interconnected mobility hubs 8 A comprehensive strategy for goods movement 9 An Investment Strategy to provide stable and predictable funding

  10. Critical Function of Mobility Hubs • Catalyze effective implementation of regional rapid transit projects • Provide multi-modal access and seamless transfers to the regional rapid transit system • Improve customer experience • Generate transit-supportive densities and destinations that support sustainable regional growth

  11. 51 Mobility Hubs identified 18 Anchor Hubs 33 Gateway Hubs 5

  12. 6

  13. 7

  14. 8

  15. Metrolinx Role in Mobility Hubs • Ensure that the hub concept is realized • Lead design and implementation • Planning and policy coordination • Optimization of public investments • Lead hub construction and development • Advance innovation in operations • Land value capture

  16. First Projects First Five Projects - $10B 18

  17. Mobility Hub Master Planning • Density and mode split targets • Design and land use vision • Station design concepts • Development potential analysis • Multi-modal transportation networks • Parking management strategies • Green Design • Phasing and implementation plan

  18. Anchor Hubs Kipling Pickering Oshawa Gateway Hubs Renforth Cooksville Port Credit Dundas W/Bloor Weston/Mt. Dennis Kennedy Unique Hubs: Airport Precinct Union 2031 Mobility Hub planning underway

  19. Kipling Station Mobility Hub KiplingMobility Hub Etobicoke Centre UGC

  20. Phase 1

  21. Phase 2

  22. Phase 3

  23. Initial TTC/GO Plan

  24. Metrolinx - Phase 1 Longer term

  25. Section

  26. Hub Planning Lessons Learned • Every mobility hub is different • Need to bring together transit agencies and municipalities • Involve an interdisciplinary team: planning, urban design, transit operators, real estate, customer services • Plan for people, but transit operations must work • Include real estate considerations early in the planning process • Use planned capital investment to leverage hub concept • Capital investment in the short-term should not preclude opportunities in the medium- and long-term • Need to develop a suite of implementation mechanisms • Lots of room for innovation (station cars, bike stations, enhanced customer information, etc.)

  27. Next Steps • Continue mobility hub planning and development • Mobility hub guidelines • Parking management strategy • Land value capture strategy

  28. www.metrolinx.com joshua.engel-yan@metrolinx.com

  29. Mobility Hubs: A Bridge between Project Delivery + Customer Service • PLACE + PROXIMITY + PURPOSE = VALUE • Integrating the perspective of the passenger into project design by: • Creating a sense of place • Well integrated customer amenities • Easily accessed by multiple modes • Optimizing the development potential from the infrastructure investment

More Related