1 / 4

CrIMSS EDR Validation Telecon - Dedicated RAOB Campaign Status Report

This document provides an update on the status of the Coordinated Dedicated RAOB Campaign for validation of CrIMSS EDR. It includes information on funded and planned RAOBs for 2012 and 2013. Year 1 Aerospace PMRF RAOB data is cleared for public release and accessible at the provided FTP link.

monita
Télécharger la présentation

CrIMSS EDR Validation Telecon - Dedicated RAOB Campaign Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Validation Dedicated RAOB Status N. R. Nalli, T. Reale, D. Tobin, L. Borg, C. D. Barnet, E. Joseph, A. Mollner, A. Gambacorta,B. Sun, B. Demoz, V. Morris, D. Wolfe, M. Oyola, M. Divakarla, T. King, M. Wilson,C. Tan, X. Xiong, X. Liu, S. Kizer, D. Gu, et al. CrIMSS EDR Validation Telecon 7 May2013

  2. ICV Coordinated Dedicated RAOB Campaign Year 1* *2012 Funded/Planned RAOBs – the planned 2012 AEROSE campaign was postponed to 2013, so included here

  3. ICV Coordinated Dedicated RAOB Campaign Year 2* *2013 Funded and/or Planned RAOBs as of 7-May-13

  4. RAOB Data • Year 1 Aerospace PMRF RAOB data (original and 100 layer RTA degraded) are cleared for public release and are available at: • ftp://www.star.nesdis.noaa.gov/pub/smcd/spb/nnalli/NPP-calval/PMRF/RAOB/ • More data will follow as it becomes ready for distribution.