GLAST Large Area Telescope Pre-Environmental Test Review Subsystem Acceptance Program Pat Hascall Systems Engineering St
90 likes | 349 Vues
Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope Pre-Environmental Test Review Subsystem Acceptance Program Pat Hascall Systems Engineering Stanford Linear Accelerator Center. LAT Test Results Roadmap. Describe the Subsystem End Item Data Package (EIDP) process
GLAST Large Area Telescope Pre-Environmental Test Review Subsystem Acceptance Program Pat Hascall Systems Engineering St
E N D
Presentation Transcript
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Pre-Environmental Test Review Subsystem Acceptance Program Pat Hascall Systems Engineering Stanford Linear Accelerator Center Subsystem Acceptance
LAT Test Results Roadmap • Describe the Subsystem End Item Data Package (EIDP) process • Summarize the Subsystem test program Subsystem Acceptance
Subsystem EIDP Process • The individual subsystem boxes were documented and delivered using an End Item Data Package process • Contents of the package defined by Systems Engineering and I&T, to include test results and NCRs to be transferred to the LAT level • Each subsystem box has a web page containing links to the relevant Acceptance Test Data Packages • Links to the ATDP web pages are available on the PreShip Review page: • http://www.slac.stanford.edu/exp/glast/flight/rdm/livepreship/lat_preship_review.html • LAT Project Management, SE, and QA have accepted all subsystems Subsystem Acceptance
Subsystem Websites • ACD • http://glast.gsfc.nasa.gov/acd/ • Calorimeter • http://heseweb.nrl.navy.mil/glast/ • Electronics and DAQ • http://www-glast.slac.stanford.edu/Elec_DAQ/Elec_DAQ_home.htm • Mechanical • http://www-glast.slac.stanford.edu/MechanicalSystems/MechHome.htm • Tracker • http://www-glast.slac.stanford.edu/Tracker-Hardware/default.htm Subsystem Acceptance
Subsystem Environmental Test Summary Subsystem Acceptance
Subsystem Environmental Test Summary LEGEND: Subsystem Acceptance
Subsystem Waivers (1/2) Subsystem Acceptance
Subsystem Waivers (2/2) Subsystem Acceptance
Summary • LAT subsystems were well tested prior to integration • Liens from those subsystem tests have been promoted to LAT level NCRs where appropriate • Ready to go to environmental test Subsystem Acceptance