1 / 22

Flight Validation Process of RNP APCH Procedures: Thailand Case Study

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012. 1. Presentation Outline. Background Objectives of Flight Validation for RNP APCH Requirements Step-by-step process Pre-flight In-flight Post-flight

moriah
Télécharger la présentation

Flight Validation Process of RNP APCH Procedures: Thailand Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 1

  2. Presentation Outline • Background • Objectives of Flight Validation for RNP APCH • Requirements • Step-by-step process • Pre-flight • In-flight • Post-flight • Reporting

  3. Background • RNP APCH = RNAV (GNSS) • Using GNSS for approach operation • For aircraft with RNP 0.3 capability • Utilize Aircraft-Based Augmentation System (ABAS) • May include Baro-VNAV

  4. Phuket PBN Implementation 4

  5. Procedures for Phuket 09 Yellow – Current VOR Track Green - PBN Track 5

  6. Objectives of Flight Validation • Proposes of Flight Validation of RNP APCH • Correctness of Procedure • Correctness of Chart • Correctness of Navigation Database • Reliability of Navigation System • Signal interference • Important GNSS parameters will be automatically recorded • Conformity with ground based Navaids (VOR, DME) as necessary • Environmental Conditions • Obstacle Clearance  thus FLC needs to be conducted during day-time • Flyability

  7. Requirements • Standards • ICAO Doc 9906 Vol 5 and 6 (Flight Validation) • ICAO Doc 8071 (as necessary) • Qualification • Pilots and FIS technicians trained on RNAV flight validation and GNSS (ICAO Doc 9906 Vol 6) • Equipment • Flight Management System (FMS) • Baro-VNAV capability for Baro-VNAV procedures • Flight Inspection System (FIS) • Navigation Database

  8. Requirements: Flight Management System • FMS – HS-CNS equipped with Pro Line 21 avionics • Certified GPS Receiver – TSO 129a is continuously checking the integrity of the GPS position solution through RAIM Fault Detection Capability

  9. Requirements:Flight Inspection System • Automatic Flight Inspection System (AFIS) • Fully automated • Record archives both as print-out and electronic database

  10. Pre-Flight Activities • Initial Validation • ATC coordination • Weather forecast • GNSS service prediction • Number of GPS satellite • Dilution of Precision (DOPs) • RAIMOutage • Satellite image of expected flight path (recommended) • Assessment of GNSS interference as needed

  11. Pre-flight: Initial Validation • Simulation of Procedure • Using FMS simulator and FIS software to validate the design • Reduce risks of error • If no error detected, upload to aircraft FMS and FIS

  12. Pre-flight:GNSS Service Prediction

  13. Pre-flight:Satellite Image Yellow – Current VOR Track Green - PBN Track 13

  14. In-Flight • For each RNAV(GNSS) Approach • Fly all segments and holdings • At least one FLC for each LNAV and LNAV/VNAV profiles • At least one FLC for entire missed approach profile • Preferably fly using auto-pilot • Fly final approach segment as designed and at 100 ft below the designed altitude • Identify controlling obstacles • Check obstacle clearance • Assess fly-ability and workloads • Record GNSS data for all legs flown

  15. In-Flight: GNSS Interference • As necessary • Under scope of flight inspection, not flight validation • Look at impact on service interruption • RAIM Alert • Loss of GNSS Service • Interference may not result in full loss of GNSS services

  16. In-Flight: GNSS Interference • Importance Parameters • Number of Satellites • Signal to Noise Ration • Dilution of Precision

  17. Post-Flight Activities • Data Analysis and Interference Assessment • Flight Validation Report

  18. Post-flight:Automated Data Recording

  19. Post-flight:GNSS Interference Assessment • Record and analysis of satellite availability, signal-to-noise ratio, and Dilution of Precision (DOPs).

  20. Post-flight:Flight Validation Report

  21. Summary • To ensure safety of flight operation, proper flight validation needs to be conducted using: • Proper equipments • Qualified personal • Proven process

  22. Thank you for your attention. Thank you for your attention.

More Related