TeleMorph & TeleTuras: Bandwidth determined Mobile MultiModal Presentation. Student: Anthony J. Solon Supervisors: Prof. Paul Mc Kevitt Kevin Curran School of Computing and Intelligent Systems, Faculty of Informatics, University of Ulster, Magee. Objectives of Research.
E N D
TeleMorph & TeleTuras:Bandwidth determined Mobile MultiModal Presentation Student: Anthony J. Solon Supervisors: Prof. Paul Mc Kevitt Kevin Curran School of Computing and Intelligent Systems, Faculty of Informatics, University of Ulster, Magee.
Objectives of Research • To develop a system, TeleMorph, that dynamically morphs between output modalities depending on available network bandwidth: • Wireless system’s output presentation (unimodal/multimodal) depending on the network bandwidth available • Implement TeleTuras, a tourist information guide for the city of Derry • Receive and interpret questions from the user • Map questions to multimodal semantic representation • Match multimodal representation to database to retrieve answer • Map answers to multimodal semantic representation • Query bandwidth status • Generate multimodal presentation based on bandwidth data
Wireless Telecommunications • Generations of Mobile networks: • 1G - Analog voice service with no data services • 2G - Circuit-based, digital networks, capable of data transmission speeds averaging around 9.6K bps • 2.5G (GPRS) - Technology upgrades to 2G, boosting data transmission speeds to around 56K bps. Allows packet based “always on” connectivity • 3G (UMTS) - digital multimedia, different infrastructure required, data transmission speeds from 144K-384K-2M bps • Positioning Systems: • GPS • DGPS • GLONASS • GSM
Mobile Intelligent MultiMedia Systems • SmartKom • Mobile, Public, Home/office • Saarbrucken, Germany • Combines speech, gesture and facial expressions on input & output • Integrated trip planning, Internet access, communication applications, personal organising • VoiceLog • BBN technologies in Cambridge, Massachusettes • Views/diagrams of military vehicles and direct connection to support • Damage identified & ordering of parts using diagrams • MUST • MUltimodal multilingual information Services for small mobile Terminals • EURESCOM, Heidelberg, Germany • Future multimodal and multilingual services on mobile networks
Intelligent MultiMedia Presentation • Flexibly generate various presentations to meet individual requirements of: 1) users, 2) situations, 3) domains • Fine-grained coordination of communication media and modalities • Key research problems: • Semantic Representation • Fusion, integration & coordination • Synchronisation
Semantic representation - represents semantics • Frame-based representations: - CHAMELEON - REA • XML-based representations: - SmartKom - MUST • Fusion, integration & coordination of modalities • Integrating different media in a consistent and coherent manner • Multimedia coordination leads to effective integrated multiple media in output • Synchronisation of modalities • Time threshold between modalities E.g. Input - “What building is this?”, Output - “This is the Millenium forum” • Not synchronised => side effect is contradiction
Intelligent MultiMedia Presentation Systems • Automatically generate coordinated intelligent multimedia presentations • User-determined presentation • COMET • COordinated Multimedia Explanation Testbed • Generates instructions for maintenance and repair of military radio receiver-transmitters • Coordinates text and 3D graphics of mechanical devices • WIP • Intelligent multimedia authoring system • presents instructions for assembling/using/maintaining/repairing devices (e.g. espresso machines, lawn mowers, modems) • IMPROVISE • Graphics generation system • constructive/parameterised graphics generation approaches • Uses an extensible formalism to represent a visual lexicon for graphics generation
Intelligent MultiMedia Interfaces & Agents • Intelligent multimedia interfaces • Parse integrated input and generate coordinated output • CUBRICON • Calspan-UB Research center Intelligent CONversationalist • Air Force Command and Control • Generates & recognises Speech; natural language text; displays graphics; interprets gestures made with a pointing device • Intelligent multimedia agents • Embodied Conversational Agents • Natural human communication - speech, facial expressions, hand gestures, & body stance • COLLAGEN • COLLaborative AGENt • object-oriented Java middleware for building collaborative interface agents • MIT Media Laboratory work on embodied conversational agents
Project Proposal • Research and implement a mobile intelligent multimedia presentation system called TeleMorph • Dynamically generates a multimedia presentation determined by the bandwidth available • TeleTuras tourist navigation aid providing testbed for TeleMorph incorporating: • route planning, maps, spoken presentations, graphics of points of interest and animations • Output modalities used • Effectiveness of communication • TeleTuras examples: • “Where is the Millenium forum?” • “Take me to the GuildHall” • “What buildings are of interest in this area?” • “Is there a Chinese restaurant in this area?”
Prospective Tools • Development language - J2ME (Java 2 Micro Edition) • Speech input/output - Java Speech API – IBM’s implementation of JSAPI “speech for Java” • US & UK English, French, German, Italian, Spanish, and Japanese • Java Speech API Markup Language (JSML) • Java Speech API Grammar Format (JSGF) • Positioning system - GPS (Global Positioning System) provides the accurate location information necessary for a LBS (Location Based Service) • Graphics input/output - The User Interface (UI) defined in J2ME is logically composed of two sets of APIs: • Low-level UI API • High-level UI API
Conclusion • A Mobile Intelligent MultiModal presentation System called TeleMorph will be developed • Dynamically morphing between output modalities depending on available network bandwidth • Bandwidth and Device determined Mobile MultiModal presentation • TeleTuras will be used as a testbed for TeleMorph • Corpora of questions to test TeleTuras (prospective users/tourists)