1 / 10

Supernova Brigade Conceptual Design Review

Supernova Brigade Conceptual Design Review. Jordan Dickard , Diana Shukis , Amanda Kuker , Michael Lotto, James Bader, Blake Firner 9/22/09. Mission Overview.

mort
Télécharger la présentation

Supernova Brigade Conceptual Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supernova BrigadeConceptual Design Review Jordan Dickard, Diana Shukis, Amanda Kuker, Michael Lotto, James Bader, Blake Firner 9/22/09

  2. Mission Overview • The BallonSat Photon Phinder will measure the intensity of light emitted from the sun at different altitudes in the atmosphere of the Earth and compare it to the voltage output of a modern photovoltaic cell. • The satellite will also measure the temperature (C˚) at different altitudes. The data collected will aid scientists in determining the optimal altitude to maximize solar cells performance. • This will aid in research for future renewable energy sources.

  3. Design Overview • Design • Solar cells and LED lights will be placed on top of the satellite so as to evenly absorb the light. • Since the LED lights and solar cells will be facing the same direction at the same time this will more accurately provide us with cohesive data. • A unique feature is that our experiment is located entirely outside of our box.

  4. Diagram of Satellite (measured in mm)

  5. Functional Block Diagram

  6. Management • Amanda Kuker: Team Leader • Jordan Dickard: Electrical/systems Engineer • Michael Lotto: Internal Systems Coordinator • Diana Shukis: Budget Manager/Scheduler • James Bader: Structural Engineer • Blake Firner: Scribe/Administration

  7. Schedule

  8. Budget Total Cost: $30.94

  9. Weight Total Weight: 850 grams

  10. Concerns • We are unsure as to how the LED lights and Solar Cells will react to the atmospheric conditions. • Structural concerns • Due to the angle of the sun during an early morning launch we are unsure if the Solar Cell and LED’s will be effective.

More Related