morton
Uploaded by
40 SLIDES
530 VUES
400LIKES

Measuring Adversaries: Challenges and Techniques in Internet Traffic Analysis

DESCRIPTION

In this talk, Vern Paxson from the International Computer Science Institute discusses the critical and complex task of measuring adversaries in internet traffic. He explores the challenges posed by deceptive behaviors in network traffic, such as evasion tactics and ambiguity in protocols. The presentation covers various measurement techniques, including passive and active approaches for characterizing adversarial actions and identifying packet origins. Additionally, it highlights the evolution of traffic analysis methods and the dynamic nature of adversaries, emphasizing the ongoing arms race in cybersecurity.

1 / 40

Télécharger la présentation

Measuring Adversaries: Challenges and Techniques in Internet Traffic Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Measuring Adversaries Vern Paxson International Computer Science Institute / Lawrence Berkeley National Laboratory vern@icir.org June 15, 2004

  2. = 80% growth/year Data courtesy of Rick Adams

  3. = 60% growth/year

  4. = 596% growth/year

  5. The Point of the Talk • Measuring adversaries is fun: • Increasingly of pressing interest • Involves misbehavior and sneakiness • Includes true Internet-scale phenomena • Under-characterized • The rules change

  6. The Point of the Talk, con’t • Measuring adversaries is challenging: • Spans very wide range of layers, semantics, scope • New notions of “active” and “passive” measurement • Extra-thorny dataset problems • Very rapid evolution: arms race

  7. Adversaries & Evasion • Consider passive measurement: scanning traffic for a particular string (“USER root”) • Easiest: scan for the text in each packet • No good: text might be split across multiple packets • Okay, remember text from previous packet • No good: out-of-order delivery • Okay, fully reassemble byte stream • Costs state …. • …. and still evadable

  8. Evading Detection ViaAmbiguous TCP Retransmission

  9. The Problem of Evasion • Fundamental problem passively measuring traffic on a link:Network traffic is inherentlyambiguous • Generally not a significant issue for traffic characterization … • … But is in the presence of an adversary: Attackers can craft traffic to confuse/fool monitor

  10. The Problem of “Crud” • There are many such ambiguities attackers can leverage • A type of measurement vantage-point problem • Unfortunately, these occur in benign traffic, too: • Legitimate tiny fragments, overlapping fragments • Receivers that acknowledge data they did not receive • Senders that retransmit different data than originally • In a diverse traffic stream, you will see these: • What is the intent?

  11. Countering Evasion-by-Ambiguity • Involve end-host: have it tell you what it saw • Probe end-host in advance to resolve vantage-point ambiguities (“active mapping”) • E.g., how many hops to it? • E.g., how does it resolve ambiguous retransmisions? • Change the rules - Perturb • Introduce a network element that “normalizes” the traffic passing through it to eliminate ambiguities • E.g., regenerate low TTLs (dicey!) • E.g., reassemble streams & remove inconsistent retransmissions

  12. Adversaries & Identity • Usual notions of identifying services by port numbers and users by IP addresses become untrustworthy • E.g., backdoors installed by attackers on non-standard ports to facilitate return / control • E.g., P2P traffic tunneled over HTTP • General measurement problem: inferring structure

  13. Adversaries & Identity:Measuring Packet Origins • Muscular approach (Burch/Cheswick) • Recursively pound upstream routers to see which ones perturb flooding stream • Breadcrumb approach: • ICMP ISAWTHIS • Relies on high volume • Packet marking • Lower volume + intensive post-processing • Yaar’s PI scheme yields general tomography utility • Yields general technique: power of introducing small amount of state inside the network

  14. Adversaries & Identity:Measuring User Origins • Internet attacks invariably do not come from the attacker's own personal machine, but from a stepping-stone: a previously-compromised intermediary. • Furthermore, via a chain of stepping stones. • Manually tracing attacker back across the chain is virtually impossible. • So: want to detect that a connection going into a site is closely related to one going out of the site. • Active techniques? Passive techniques?

  15. Measuring User Origins, con’t • Approach #1 (SH94; passive): Look for similar text • For each connection, generate a 24-byte thumbprint summarizing per-minute character frequencies • Approach #2 (USAF94) - particularly vigorous active measurement: • Break-in to upstream attack site • Rummage through its logs • Recurse

  16. Measuring User Origins, con’t • Approach #3 (ZP00; passive): Leverage unique on/off pattern of user login sessions: • Look for connections that end idle periods at the same time. • Two idle periods correlated if ending time differ by ≤  sec. • If enough periods coincide  stepping stone pair. • For A  B  C stepping stone, just 2 correlations suffices • (For A  B  … C  D, 4 suffices.)

  17. Measuring User Origins, con’t • Works very well, even for encrypted traffic • But: easy to evade, if attacker cognizant of algorithm • C’est la arms race • And: also turns out there are frequent legit stepping stones • Untried active approach: imprint traffic with low-frequency timing signature unique to each site (“breadcrumb”). Deconvolve recorded traffic to extract.

  18. Global-scale Adversaries: Worms • Worm = Self-replicating/self-propagating code • Spreads across a network by exploiting flaws in open services, or fooling humans (viruses) • Not new --- Morris Worm, Nov. 1988 • 6-10% of all Internet hosts infected • Many more small ones since …… but came into its own July, 2001

  19. Code Red • Initial version released July 13, 2001. • Exploited known bug in Microsoft IIS Web servers. • 1st through 20th of each month: spread.20th through end of each month: attack. • Spread: via random scanning of 32-bitIP address space. • But: failure to seed random number generator  linear growth reverse engineering enables forensics

  20. Code Red, con’t • Revision released July 19, 2001. • Payload: flooding attack onwww.whitehouse.gov. • Bug lead to it dying for date ≥ 20th of the month. • But: this time random number generator correctly seeded. Bingo!

  21. Worm dies on July 20th, GMT

  22. Measuring Internet-Scale Activity: Network Telescopes • Idea: monitor a cross-section of Internet address space to measure network traffic involving wide range of addresses • “Backscatter” from DOS floods • Attackers probing blindly • Random scanning from worms • LBNL’s cross-section: 1/32,768 of Internet • Small enough for appreciable telescope lag • UCSD, UWisc’s cross-section: 1/256.

  23. Spread of Code Red • Network telescopes give lower bound on # infected hosts: 360K. • Course of infection fits classic logistic. • That night ( 20th), worm dies … … except for hosts with inaccurate clocks! • It just takes one of these to restart the worm on August 1st …

  24. Could parasitically analyze sample of 100K’s of clocks!

  25. The Worms Keep Coming • Code Red 2: • August 4th, 2001 • Localized scanning: prefers nearby addresses • Payload: root backdoor • Programmed to die Oct 1, 2001. • Nimda: • September 18, 2001 • Multi-mode spreading, including via Code Red 2 backdoors!

  26. Code Red 2 kills off Code Red 1 Nimda enters the ecosystem CR 1 returns thanksto bad clocks Code Red 2 settles into weekly pattern Code Red 2 dies off as programmed

  27. With its predator gone, Code Red 1 comes back!, still exhibiting monthly pattern Code Red 2 dies off as programmed Nimda hums along, slowly cleaned up

  28. 80% of Code Red 2 cleaned up due to onset of Blaster Code Red 2 re-re-released Jan 2004 Code Red 2 re-released with Oct. 2003 die-off Code Red 2 dies off again Code Red 1 and Nimda endemic

  29. Detecting Internet-Scale Activity • Telescopes can measure activity, but what does it mean?? • Need to respond to traffic to ferret out intent • Honeyfarm: a set of “honeypots” fed by a network telescope • Active measurement w/ an uncooperating (but stupid) remote endpoint

  30. Internet-Scale Adversary Measurement via Honeyfarms • Spectrum of response ranging from simple/cheap auto-SYN acking to faking higher levels to truly executing higher levels • Problem #1: Bait • Easy for random-scanning worms, “auto-rooters” • But for “topological” or “contagion” worms, need to seed honeyfarm into application network • Huge challenge • Problem #2: Background radiation • Contemporary Internet traffic rife with endemic malice. How to ignore it??

  31. Measuring InternetBackground Radiation -- 2004 • For good-sized telescope, must filter: • E.g., UWisc /8 telescope sees 30Kpps of traffic heading to non-existing addresses • Would like to filter by intent, but initially don’t know enough • Schemes - per source: • Take first N connections • Take first N connections to K different ports • Take first N different payloads • Take all traffic source sends to first N destinations

  32. Responding to Background Radiation

  33. Hourly Background Radiation Seen at a 2,560-address Telescope

  34. Measuring Internet-scale Adversaries: Summary • New tools & forms of measurement: • Telescopes, honeypots, filtering • New needs to automate measurement: • Worm defense must be faster-than-human • The lay of the land has changed: • Endemic worms, malicious scanning • Majority of Internet connection (attempts) are hostile (80+% at LBNL) • Increasing requirement for application-level analysis

  35. The Huge Dataset Headache • Adversary measurement particularly requires packet contents • Much analysis is application-layer • Huge privacy/legal/policy/commercial hurdles • Major challenge: anonymization/agents technologies • E.g. [PP03] “semantic trace transformation” • Use intrusion detection system’s application analyzers to anonymize trace at semantic level (e.g., filenames vs. users vs. commands) • Note: general measurement increasingly benefits from such application analyzers, too

  36. Attacks on Passive Monitoring • State-flooding: • E.g. if tracking connections, each new SYN requires state; each undelivered TCP segment requires state • Analysis flooding: • E.g. stick, snot, trichinosis • But surely just peering at the adversary we’re ourselves safe from direct attack?

  37. Attacks on Passive Monitoring • Exploits for bugs in passive analyzers! • Suppose protocol analyzer has an error parsing unusual type of packet • E.g., tcpdump and malformed options • Adversary crafts such a packet, overruns buffer, causes analyzer to execute arbitrary code • E.g. Witty, BlackIce & packets sprayed to random UDP ports • 12,000 infectees in < 60 minutes!

  38. Summary • The lay of the land has changed • Ecosystem of endemic hostility • “Traffic characterization” of adversaries as ripe as characterizing regular Internet traffic was 10 years ago • People care • Very challenging: • Arms race • Heavy on application analysis • Major dataset difficulties

  39. Summary, con’t • Revisit “passive” measurement: • evasion • telescopes/Internet scope • no longer isolated observer, but vulnerable • Revisit “active” measurement • perturbing traffic to unmask hiding & evasion • engaging attacker to discover intent • IMHO, this is "where the action is” … • … And the fun!

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer