This document provides a comprehensive overview of the PACS commissioning phase, detailing the preparation steps, planning, and timeline. It covers essential processes like FDIR, SFT, and tuning of chopper and grating controllers, along with functional tests (FFT) and performance evaluations (SPT). Additionally, it includes links to the instrument user manual and detailed plans for CoP and analysis procedures for various tuning aspects. The completion of these tasks is crucial for ensuring optimal operation and performance during the commissioning phase.

nam
Télécharger la présentation

Overview of PACS Commissioning Phase: Preparation, Planning, and Timeline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CoP Preparation H. Feuchtgruber CoP Plan and Timeline

  2. PACS Commissioning Phase Overview (1) • FDIR • SFT HeII • Chopper controller parameter tuning • Grating controller parameter tuning • Full functional test (FFT) • Short performance test (SPT) • Ge:Ga detector tuning • Telescope background measurement • Bolometer detector tuning CoP Plan and Timeline

  3. PACS Commissioning Phase Overview (2) • Instrument User Manual - Covers FDIR, SFT, Chopper and Grating tuning [ftp://ftp.mpe.mpg.de/people/pacs/PACS_User_Manual/PACS-ME-UM-002_Issue_1_3_User_Manual.pdf] - Conceptually tested during SOVT2 real time commanding • PACS Commissioning Phase Plan - PACS-ME-PL-024, issue 1.2 + attachments E:\PACS Project\CoP Plan\PACS Commissioning Phase Plan PACS-ME-PL-024 issue1.2.pdf CoP Plan and Timeline

  4. Commissioning Phase Details (1) CoP Plan and Timeline

  5. Commissioning Phase Details (2) CoP Plan and Timeline

  6. CoP X-HSPOT Proposals HF: repetition of IST and TBTV HF: repetition of IST and TBTV HF: repetition of IST and TBTV HF: take a full spectrum of the early telescope KO, MS MS, KO KO, TM PR, HD MN, UK CoP Plan and Timeline

  7. CoP X-HSPOT Proposals Example: GeGa_Bias_1 CoP Plan and Timeline

  8. Analysis & Uplink Feedback (1) CoP Plan and Timeline

  9. Analysis & Uplink Feedback (2) CoP Plan and Timeline

  10. Analysis & Uplink Feedback (3) • Analysis procedures for: FDIR, SFT HeII, FFT, SPT-SPEC and SPT-PHOT exercised already twice during IST (report available) and TBTV (report in progress). • A similar report will be generated based on the results of these tests during commissioning phase. CoP Plan and Timeline