1 / 7

Update on Sensor procurement and October DESY Test Beam

Update on Sensor procurement and October DESY Test Beam. Mathieu Benoit . Sensor Procurement and plans. Timepix ASIC. Proposition for a 64x64 CLICPix like HV-CMOS sensor AMS 180nm HV-CMOS process Option 1 : Dedicated CLICPix Chip (5mm 2 )

neal
Télécharger la présentation

Update on Sensor procurement and October DESY Test Beam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Sensorprocurement and October DESY Test Beam Mathieu Benoit

  2. SensorProcurement and plans Timepix ASIC • Proposition for a 64x64 CLICPixlike HV-CMOS sensor • AMS 180nm HV-CMOS process • Option 1 : DedicatedCLICPix Chip (5mm2) • ~5000 euros for a Run, 64x64 pxiels , 25um pitch, amplification only • Sharewith ATLAS : 64x64 pixels, 80% 25um pitch, 20% with ATLAS Like pixel (250x50um), suggestedshare (~4000 euros CLIC, ~2000 euros ATLAS) • Possible interestfrom Glasgow for HV-CMOS with Timepix-Like and FEI4 like pixels, withvariouslevel of intelligence • Analogonly, • Digital only, • Digital withadjustablelevel and smallerthan pixel sensitive matrix - + + - 50um TOT=0-3 TOT=4-7 250um TOT=8-11 TOT=12-15

  3. October 2013 setup telescope planes DATURA telescope TLU DUT Rotation / Transl. Stages MiM-TLU HV source DUT Fitpix Temp. r/o DUT holder Timepix DAQ

  4. Telescope resolution

  5. Run summary October 2013 • 185 good runs (4 assemblies) from Oct 21, 17h to Oct 25, 22h • using same MiM-TLU as in August TB • 15 tracks per Timepixshutter • rotation scans from 0 to 75 degrees • threshold scans (at 0 degrees) • efficient data taking at ~100-150 Hz, except for intermittent problems with telescope DAQ crashes(under investigation now by DESY Windows expert) August 2013 TB : 616 632 783 Trigger in 12 days, 81MTrigger/dayinstead 51MTrigger/day!

  6. Dones & To-Dos (Reconstruction) • Dones : • All Telescope data nowreconstructed(Trackingwith EUDET only) • 0 degree incidence data aligned and trackmatched /waiting in the batch for reco (somespace issue to besolved) • To-Dos : • Fixalignmentalgorithmwithtiltedsensors • Align and track-match angle data • Plot Efficiencycurve for rTHL scans • Reprocess data withvarious TOT rebinning • Reprocess data with Calibration • ReproduceTestBeam Data in Simulation (Ongoing) • Note in preparation : Evaluation of Tracking performance of Ultra-Thin Active EdgeSilicon pixel Timepix Assemblies for CLIC Vertex Detector R\&D

  7. RunSummary Cleaning up beam area Sample change Night Crash THL Scans

More Related