1 / 20

Demand Management

Demand Management. Dr. Ron Tibben-Lembke SCM 461. Role of Demand Management. Collect information from all demand sources Customers Spare parts Negotiate and Confirm shipping dates, quantities Confirm order status, communicate changes. Different Environments.

nemo
Télécharger la présentation

Demand Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Demand Management Dr. Ron Tibben-Lembke SCM 461

  2. Role of Demand Management • Collect information from all demand sources • Customers • Spare parts • Negotiate and Confirm shipping dates, quantities • Confirm order status, communicate changes

  3. Different Environments • Factory to customers – plant very aware of customer needs • Factory to DC – stable replenishment plan • Plan vs. Forecast: • Forecast is what you think demand will be like • Plan is how you will respond to demand • “A manager cannot be held responsible for not getting a forecast right.” • How are you going to respond to changes in demand? • You have control over the plan and execution, not demand • Rain forecasted? You decide to bring umbrella or not. • Planning a BBQ: 300 people? 500?

  4. Independent vs. Dependent Demand • Feeding manufacturing, demand for parts is dependent on manufacturing plan • Sales to customers are independent of our (production) activities. • Customer order decoupling point: when control of timing passes from customer to us • Make to stock – Finished goods • Assemble to Order – WIP • Make to Order – Raw Materials • Engineer to Order - suppliers

  5. Make to Stock • Customers buy finished, generic product • McDonalds’ heat lamp days • Triggers signal to make more • Use warehouses, DCs to fulfill demand • Maybe VMI? • Tradeoff of more flexible manufacturing, faster response, for less inventory

  6. Assemble to Order • Define customer’s order in terms of alternative components and options • Subway, In-N-Out • Configuration management: combine options properly into a buildable final product • Flexibility in combining components, options, and modules • Movement from MTS to ATO – less inventory, fresher product, better sales • Combinations: • 31 ice cream * 4 sauces * 12 sprinkles = 1,488

  7. Make/Engineer to Order • No stock components to assemble • Cooking at home – could make any of the standard things you usually make: burger, pizza, chili, etc., etc. • Include Engineer to Order • Tell me what you’d like – fancy restaurant • Significant design element in order creation • Don’t know possibilities of what customers might buy

  8. What do you think? • Which method is best? • What kinds of uncertainty are involved in each? • What determines customer service in each? • What is the decoupling point in each system?

  9. Communication with Depts. • SOP – give forecasts, get prod. Plans • Capacity: material (MTS), labor (MTO) • Timing of deliveries & production • Master Production Scheduling • Detailed order info to MPS • Status of each order • Figs 2.5, 2.6

  10. Forecasting Framework • Fig. 2.7, p. 30

  11. Aggregating Demand • Long-term, or product-line forecasts more accurate than short term or detailed forecasts • Monthly: Avg = 20, std dev =2 • 95%: 16-24 which is +/- 20% • Annual: Avg = 20 * 12 = 240 • Std. Dev = 2 * sqrt(12) = 6.9 • 95%: 226-254, which is +/- 5.8% • Easier to forecast demand for components than for sales of particular car configurations.

  12. Aggregating Demand • Individual item forecasts must add up to correct total • Individual item percentage of total probably constant • Pyramid forecasting – bring things into alignment • Force people to accept higher targets without “owning” them

  13. PredictingDemand

  14. Shared components Grand Am Grand Prix Grand Prix

  15. 2006 Solstice • MSRP around $20,000

  16. HP Inkjet Printers • Printers made in Vancouver, sent via ship through Panama Canal to Europe • Europe warehouse stocks inventory by country • physically different-- power supply • manuals different languages • Substitution not allowed • Re-supply time very long

  17. Euro Plugs • No standardized power supplies for Europe • Different power supply for every country.

  18. HP Inkjet Printers • Redesigned printers so that power supply added in Europe • Re-engineer product, power supply • Assembly done in a warehouse (Quality?) • Manuals added in Europe • Many expensive changes • Store ‘vanilla’ boxes • Postpone point of differentiation

  19. Delayed Customization Production Storage Shipping Storage Before After

  20. Benetton • Benetton sweaters made of undyed wool, dyed once demand is known • Dyeing LT much faster than production • How many undyed sweaters to make? • How many Red, Green, Blue, also, if this production process is cheaper, and you know you’ll sell some minimum amount?

More Related