WP3: ‘Rapid data delivery at 4 NDACC stations’

WP3: ‘Rapid data delivery at 4 NDACC stations’. Partners: BIRA-IASB INTA Universitaet Bern Karlsruher Institut fuer Technologie CNRS Universitaet Bremen Université de Liège Science and Technology B.V.

newton
Télécharger la présentation

WP3: ‘Rapid data delivery at 4 NDACC stations’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP3: ‘Rapid data delivery at 4 NDACC stations’ Partners: BIRA-IASB INTA Universitaet Bern Karlsruher Institut fuer Technologie CNRS Universitaet Bremen Université de Liège Science and Technology B.V. NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 1

  2. WP3 objectives • To implement procedures for operational delivery of NDACC data to the NORS data server with a delay of maximum 1 month after data acquisition • Use of a common HDF format compliant with GEOMS (Generic Earth Observation Metadata Standard) guidelines • Data andstations: NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 2

  3. WP3 tasks • For all WP3 participants: • Task 3.1: Development of software routines to save data in the defined HDF format compliant with GEOMS • Task 3.2: Implementation of automatic data processing systems generating the data products, including a QA/QC validation step • Task 3.3: Set up of data delivery systems providing the data products within 1 month to the NORS data center (MS3, Month 6: April 2012) • Task 3.4: Test runs and demonstration of operational data delivery system • Task 3.5: Optimisation of data delivery system • Task 3.6: Routine data delivery to the NORS data center (D3.1, Month 21: July 2013) NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 3

  4. Rapid data delivery system IASB-BIRA rapid data delivery system (UV-VIS data): Vertical profile +information content +error budget QA/QC OEM profiling HDF files on NORS data server Absorption spectra on BIRA-IASB server Absorption spectra at station ftp QDOAS analysis HDF files ftp DSCDs column retrieval AMF LUTs Vertical columns +information content +error budget QA/QC AVK LUTs NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 4

  5. HDF/GEOMS data format Format description and tools for HDF files creation are available on AVDC at: http://avdc.gsfc.nasa.gov/index.php?site=1876901039 Important for the NDACC UV-vis WG to move to this data format NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 5

  6. Quality Assurance/Quality Control • Regarding the HDF files content and format, verifications are performed by the idlcr8hdf.savIDL program, e.g.: • Variable values outside the specified range • Uncorrect fill-in values • Inconsistencies in the time variable (DATETIME) • …. • Additional quality checks to implement (to be discussed): • Profile retrievals based on OEM: remove retrievals with low DOFS and/or large residuals • For stratospheric NO2 columns, remove data contaminated by tropospheric pollution (Langley-plot technique) • …. NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 6

  7. Planning of rapid data delivery • Month 6 (April 2012): for each partner, set up and demonstration of their rapid data delivery system • Months 7-20 (May 2012-June 2013): Optimisation of data delivery systems • Month 21 (July 2013): Operational data delivery • Month 22 (August 2013): Preliminary documentation of data delivery systems • Month 33 (July 2014): Final documentation of data delivery systems After NORS, implementation of a similar data delivery system for all the NDACC UV-vis stations ? NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 7