An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Private – PublicCollaboration in Water Management

  2. index OwnershipModel. Ostrava (CzechRepublic) BOT Model. New Cairo (Egypt) Performance Based O&M. Al Ain WastewaterSystem (Abu Dhabi, UAE) 2

  3. 1 OwnershipModel. Ostrava (CzechRepublic) - Datos principals de la actividad técnica del CYII - Mercado nacional - Mercado internacional 3

  4. Ostrava 1. OwnershipModel. Ostrava (CzechRepublic) • Severomoravské vodovody a kanalizace Ostrava a.s. (SmVaK), isone of thefourbiggestwatercompanies of theCzechRepublic. Itowns and operatestheentirewater and wastewatersystem in itsgeographicalarea. Prague Ostrava OstravaRegion 4

  5. 1. OwnershipModel. Ostrava (CzechRepublic) MainWTPs Reservoirs Transport Pipelines 5

  6. 1. OwnershipModel. Ostrava (CzechRepublic) Populationserved: 1,267,532 HouseConnections: 120,764 Network pipeline length (km): 4,820 WTP´s: 49 Reservoirs: 388 WWTP´s: 68 Sewerlength (km): 1,565 Potable Network Efficiency (%): 88.9-90 6

  7. 1. OwnershipModel. Ostrava (CzechRepublic) Investmentoninfrastructure (million €) CAGR = 5.61% 20.8 19.3 19.4 17.0 16.7 7

  8. 1. OwnershipModel. Ostrava (CzechRepublic) SmVaKWaterTariffs are belowtheaveragevalues in CzechRepublic Average Potable WaterTariff In Czech (€): 1.30 AverageWastewaterTariff In Czech (€): 1.13 SmVaK Potable WaterTariff (€): 1.21 SmVaKWastewaterTariff (€): 1.07

  9. 1. OwnershipModel. Ostrava (CzechRepublic) Web Portal and Call Center

  10. 1. OwnershipModel. Ostrava (CzechRepublic) • FromOctober 2006, SmVaK ‘s QualityAssuranceSystemiscertified (ISO 9001, 14001 y OHSAS 18001)

  11. 2 BOT Model. New Cairo (Egypt) - Datos principals de la actividad técnica del CYII - Mercado nacional - Mercado internacional 11

  12. 2. BOT Model. New Cairo (Egypt) • - SPV company founded by OCI and aqualiaon a 50%-50% basis • - First PPP in Egypt • - 250,000 m3/d waste water treatment plant • - Reuse of treated Effluent and sludge is Orasqualia’s obligation • - Investment of MEGP 786 (102 Million USD) • - Awards : • · Best PPP in Project Finance in the world year 2010 by Global Water Intelligence • ·Received from HM Queen Noor of Jordan the award of best PPP project of the year 2010 in Paris. • · Best African PPP in Project Finance year 2010 by EUROMONEY

  13. 2. BOT Model. New Cairo (Egypt) Ministry of Finance – PPP Unit Ministry of Housing – NUCA. New Cairo ArabRepublic of Egypt CAPW – Tech. Regulator PPP AGREEMENT aqualia 45% DIRECT AGREEMENT 50% OCI Backer and McKenzie Lawyer 5% aqualia infraestructuras O&M AGREEMENT NSGB CIB Arab Africa AhliUnited FACILITY AGREEMENT EPC AGREEMENT OrasqualiaforOperation Zulficar / Lawyers 50% aqualia Enviro-Civec= Independent TechnicalAdvisor OrasqualiaforConstruction 50% OCI Cairo Consult – EngineeringSubcontractor

  14. 2. BOT Model. New Cairo (Egypt) Project Key Dates: - PPP Contract effectiveness : 28-3-2010 - Initial Scheduled Plant Operational Date : 28-3-2012 - Extended Scheduled Plant Operational Date (Due to the Revolution FM): 28-5-2012 - First invoice for Capacity Charge (on a quarterly basis) : 28-6-2012 - First Payment of Capacity Charge: before 28-7-2012 (as per Contract terms) - First Loan Installment (on a biannual basis): 30-9-2012 - Start Commissioning: End of May 2012

  15. 3 Performance Based O&M. Al Ain WastewaterSystem (Abu Dhabi, UAE) - Datos principals de la actividad técnica del CYII - Mercado nacional - Mercado internacional 15

  16. 3. Performance Based O&M. Al Ain WastewaterSystem (Abu Dhabi, UAE)

  17. 3. Performance Based O&M. Al Ain WastewaterSystem (Abu Dhabi, UAE) Project Main figures

  18. 3. Performance Based O&M. Al Ain WastewaterSystem (Abu Dhabi, UAE) Performance measurementthroughKPI´s. Paymentismodifiedaccordingto performance through a pain-gainsystem

  19. 3. Performance Based O&M. Al Ain WastewaterSystem (Abu Dhabi, UAE) Example of KPI: Energy use

  20. Conclusions There are manydifferent PPP schemes, all of which are applicable in theKingdom. Key tothesuccess of a PPP isthecorrectallocation of risksbetweenpublic and privatepartners. Capital investment can beincluded in theprivatesidethroughownershipor capital return, orit can besuppliedexclusivelybythepublicside.

  21. Conclusions • If capital issuppliedbytheprivate sector: • Thepublicbudget has more financialcapabilityforother uses. • In the case of theKingdom, thecost of financewillbeslightlyhigher. • When a PPP modelisimplementedwherethereis a good balance betweencontractor-operator and investors, thentheoverall balance of pricingisvery beneficial duetointernalsynergies. • Theprojectmustbebankable and correctinternationalriskallocationiscritical.