130 likes | 190 Vues
Case study AQUATIM SA – Water and sewerage operator in the Timis County. Water treatment particularities for compliance with the European regulations. Ilie Vlaicu, PhD, General Director Aquatim SA. Con tents. General information - Timi s County General information - Aquatim SA
E N D
Case study AQUATIM SA – Water and sewerage operator in the Timis County Water treatment particularitiesfor compliance with the European regulations Ilie Vlaicu, PhD, General Director Aquatim SA
Contents • General information - Timis County • General information - Aquatim SA • Hystorical background of the water supply in Timisoara • Drinking water in Timisoara • Applied research • Reducing the water losses • Sustainable development
General informationTimis County • Area 8697 km²; • July 2007 : 670 000 inhabitants; • Urban population 72.6 %. • 69% population connected to the water supplysystem; • 54.7 % population connected to the wastewater collection system.
General informationAquatim SA • Water supply and sewerage services, • 350 000 consumers; • 130 l water/day per capita, in Timisoara; • 1st class operating licence (NRAPS); • Integrated management system quality, environment, occupational health (ISO 9001, ISO 14001, OHSAS 18001).
Hystorical background of water supply in Timisoara 2002 100% metering; 2007Regional Operating Company. 1912 Wastewater Treatment Plant; 1914 Water Treatment Plant (ground sources); 1916 Treatment Plant for Water for industrial use; 1959 Water Treatment Plant (surface sources);
Drinking waterIn Timisoara • Supply from 2 sources: 30% drills, 70% River Bega; • Automatic pressure controlin the supply system; • State-of-the-art technology for water treatment - on-line monitoring and automatic dosing of the reagents on entire process flow, from catchment to distribution.
Applied research • 3 pilot plants scaled with the treatment facilities, to monitor the process flow for groundwater and surface water treatment, and wastewater treatment; • Studies on the optimisation of stages of the water treatment process; • Use of new coagulation agents; • Biodegradation tests.
PROPUSE PENTRUMONITORIZARE ÎN CURS DE MONITORIZARE MONITORIZATE STA STA STAŢIE DE TRATARE STA DEBITMETRE STA Reducing the water losses • Pressure monitoring throughout the water supply system; • An approach to the sectorization of the water supply system; • Organisation and prioritisation of the investments; • Measuring the efficiency of the implemented investments.
Sustainable developmentISPA Funds • Rehabilitation of the WWTP; • Rehabilitation of 2.46 km and extension of 10 km of the sewerage system; Rehabilitation of the treatment technology of wastewater and improving the sewerage network for the population of Timisoara city, situated in the Timis County in Romania • 45.36 mil. Euro,out of which 32.2 mil. Euro grant.
Sustainable development Cohesion Funds • The ISPA Measure ensures the Technical Assistance for the preparation of the Timis County Master Plan and the Financing Application for Cohesion Funds; • The Feasibility Studies for priority investments are in progress; • The Financing Application is to be submitted by Aquatim at the end of January 2009.
Thank you! For more information about Aquatim you can contact us : Phone 004.0256.201 370 Fax 004.0256.294 753 e-mail aquatim@aquatim.ro web site www.aquatim.ro