An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bridge Owners Forum ESDAL Stakeholder Management Team May 2008 bringing service to life

  2. ESDAL Project - Outline • ESDAL Project Update • Data Elements • Phases 2, 3 & 4 • ICA’s • Data Updates

  3. Project Update Phase 1 Operational 03/03/06 Phase 2 Operational 14/01/08 Phase 3 Autumn 08 Phase 4 Summer 09 • Data Collection 168 LA’s providing data 192 Total data providers Total number of structures collected - 209597 Expected number of ESDAL structures - 116131 Total structures transformed 110592 Total structures cleansed 74727

  4. Data Elements • Essential Data • Structure Key - Your unique identifier for the structure • Location - A grid reference which may be OSGR format or another co-ordinate pair • Notification Contact – details of the person to be notified with regards to abnormal loads for a given structure • Category The type of structure - for example Road Bridge, Elevated Road, Culvert, Level Crossing, from a pre-defined list of values.

  5. Data Elements Additional structure information would also be most useful: • Structure Name - The name or identifier you use for the structure • Alternative Names - Any other names that are used • Managing Authority - Contact details for the delegated authority responsible for receiving abnormal load notifications • Object Under - The road, railway or other path passing under the bridge • Object Over - The road, railway or other path passing over the bridge • Structure Length - The overall span of the structure – may be between bearing centrelines, deck joints or abutment faces • Width Over - The minimum clear width between parapets

  6. Data Elements • Width Under - The minimum clear width between kerbs and abutments where a route passes under the structure • Safe Vehicle Height - The maximum permissible height of a vehicle and load able to pass under the lowest part of the structure • Gross Weight Limit - The maximum permissible gross weight of vehicle and load able to pass over the structure • Axle Weight Limit - Maximum permissible single axle weight of vehicle and load able to pass over the structure • Structure Description - Any additional information which might help to clarify the structure’s type or location • HB/SV rating • Number of spans • Details of publically available heights & weights

  7. Data Elements • Height Envelope - The maximum permissible envelope through which a load may pass under the structure – for example, where a particular route path under the structure will allow a higher load than the specified height limit. • Intellectual property rights for the data remain with the structure owner at all times. Any data collected by the ESDAL team will not be used for anything other than the ESDAL system without prior written permission.

  8. Phases 2, 3 & 4 • Phases 2 & 3 • Allows Hauliers to submit applications and to notify all abnormal loads through a website. • Detailed route identification gives clear picture of proposed route to notifiable authorities. • Map based review of route and structures • List of affected structures • Facility to comment on proposed special order route • Standard format for ESDAL notifications and applications • Routine alert of unread notifications by fax or email • You can filter notifications to see only notifications that affect a given structure

  9. Phases 2, 3 & 4 • Phase 4 • Online editing of own structure data • Constraints & restrictions • “Indicative Capacity Appraisals” • Ability to produce statistical information allowing better management of abnormal loads and structures • Bridge Heights Using signed height and weight data for use of third parties to assist in reducing bridge strikes.

  10. ICA’s • Indicative Capacity Appraisal • Structure owners notification will indicate whether the proposed load is suitable for individual structures • Hauliers see an indication of whether there is a potential problem with the proposed route • Reduction in unsuitable notifications • Appraisal methods, such as weight screening, influence line, BD86

  11. Data Updates The key to ESDAL is maintaining accurate data • Structure Data • We will send an email to the data holder asking for data updates every six months from the date of the original provision of data. • Contact data • We confirm contact data every three months by sending an email to the notification contact asking them to confirm their details

  12. Thank you for your attention www.highways.gov.uk/esdal For more information, visit