1 / 14

Jump Start Briefing For Integrated Logistics Systems-Supply (ILS-S) Program

Jump Start Briefing For Integrated Logistics Systems-Supply (ILS-S) Program. Briefer: Pete Talamonti HQ 754 ELSG/ILS (LMI) 9-11 Oct 2007. Overview. Project Organization Core Team Members ILS-S Program Description Key Business Functions Information Flows ILS-S System View Solution

nituna
Télécharger la présentation

Jump Start Briefing For Integrated Logistics Systems-Supply (ILS-S) Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jump Start Briefing For Integrated Logistics Systems-Supply (ILS-S) Program Briefer: Pete Talamonti HQ 754 ELSG/ILS (LMI) 9-11 Oct 2007

  2. Overview • Project Organization • Core Team Members • ILS-S Program Description • Key Business Functions • Information Flows • ILS-S System View • Solution • Transactions • Successes • Milestone Schedule

  3. Project Organization Project Management IPT HQ 754 ELSG/ILS Program Manager –Mr. Herbert H. Hunter, Jr. Project Manager – MSgt William Harrington Project Lead – Mr. Pete Talamonti (Ctr) Requirements and Functional Team Pete Talamonti (Ctr) Engineering Team James Harbison Testing Team Toni Briggs

  4. Core Team Members Program Manager Mr. Herbert H. Hunter, Jr. Herbert.Hunter@gunter.af.milDSN: 596-5229 Comm: (334) 416-5229 Project Manager MSgt William Harrington William.Harrington@Gunter.af.mil DSN: 596-4037 Comm: (334) 416-4037 Project Team Lead Mr. Pete Talamonti (Ctr) Peter.Talamonti@Gunter.af.milDSN: 596-2012 Comm: (334) 416-2012 System Engineer James Harbison james.harbison.1@usaf.milDSN: 596-2655 Comm: (334) 416-2655 Test Team Lead Ms. Antoinette Briggs Antoinette.Briggs@Gunter.af.mil DSN: 596-4458 Comm: (334) 416-4458

  5. ILS-S Program Description • ILS-S is the modernized version of the legacy Standard Base Supply System (SBSS) • The SBSS is the standard base level inventory accounting and ordering management system for the Air Force • ILS-S was achieved through implementation of modern information technologies • ILS-S integrates retail and wholesale supply systems and was developed to provide maximum support of the AF flying mission and AF support organizations • Major Customer:HQ AF/A4 • Users/Scope of System:USAF Supply Personnel - Worldwide • Phase of Program:Operations & Sustainment

  6. Key Business Functions • Place/Track Customer Orders • Place/Track Replenishment Orders • Redistribute (Ship/Transfer) Assets • Return/Track Reparable Assets • Financial Accounting (Base/Organization) • Asset Accounting (Equipment) • Record and Calculate Demand Data (Consumption) • Asset Accounting (Peacetime/Wartime Inventories)

  7. Information Flows 5M Transactions per month

  8. SATS - DOD AIT Program (hand-held scanners for input into SBSS) Wireless data transmission - 7 virtual platforms on 2 Unisys mainframes -- incl. MASS module (MICAP Asset Sourcing System) SBSS - Maintains AF Supply Central Data Base (AFSCDB) for reporting DISA Oklahoma City - Tinker ILS-S System View Interfaces(subset): AFDS SNUD SPS/CITS SMAS WSMIS-RCAS SCS CSMS DMAS IMWRP RAMPS RBL RMS G081 IMDS OLVIMS AFIS CMOS DCAPES DSS DLAMIS DMAPS AFTOC MERLIN SDB MICAP JOCAS WIMS AFEMS WSMIS-SAV ATAC-AF JTAV DRMS CICP Interfaces, Other Services, and Govt Agencies Via DAAS/DLIS GCSS-AF Integration Framework • Framework application • and database servers • Near real-time data access and transactional capability to SBSS (and also SCS) ES-S DISA Montgomery - Gunter DLMS Transformation Note: interfaces documented in ICD’s maintained at ILS-S PMO.

  9. SCS Solution Business Rules and Transformations (i.e., MILS to/from DLMS) reside in Enterprise Application Integration (EAI) Layer for use by multiple application components SBSS GCSS-AF Integration Framework EAI Layer DAAS AF Portal User Interface Application Component Application Component DLA BSM … DLMS Formats Application Component

  10. Transactions • DLMS / MILS TRIC/DIC (Transaction Name) 511R - A01, A02, A04, A0A, A0B, A0DRequisition 940R - A21, A22, A24, A25,A2A, A2B, A2D, A2ERedistribution Order 940R - A41, A44, A45, A4A, A4B, A4EReferral Order 869C - AC1Cancellation Request of Requisition 940R - AC6Cancellation of Requisition 870S - AE1, AE2, AE3, AE4, AE6, AE9Supply Status 869A - AF1, AFC, AFTShipment Follow Up 940R - AF6, AFX, AFZShipment Follow Up 511M - AM1, AM2, AM4, AM5, AMA, AMB, AMD, AMERequisition Modification 856S - AS1, AS2, AS3, AS4, AS6, AS8Shipment Status 869F - AT1, AT2, AT4, AT5, ATA, ATB, ATD, ATERequisition Reinstatement 856S - AU1, AU2Reply to Cancellation Request 527R - DRA, DRB, DRFMateriel Receipt Acknowledgements 527D - DWAPush Due-in 527R - DXBMateriel Receipt Follow-up 812R -FAE, FAFCustomer Request for Billing

  11. Transactions (cont.) • DLMS / MILS TRIC/DIC (Transaction Name) 870M -FT6ICP Follow-up 180M - FTAPICA/SICA Unserviceable Shipment 812L - FTBReply to Follow-up for Credit Status 180M - FTCDLA Excess Cancellation 870M - FTDDelayed Disposition Instruction 180M - FTEReport of Customer Excess 180M - FTFFollow-up on DLA Excess 870M - FTLExcess Supply Shipment Status 856R - FTMExcess Shipment Status812RFTPFollow-up for Credit 870M - FTQCustomer Report of Excess reporting Document 870M - FTRShipment Document DLA Excess 180M - FTTFollow-up for ICP Materiel Receipt Status 870M - FTZExcess Shipment Receipt

  12. Successes ES-S Jump Start software does the following: • Transforms 82 MILS transactions to/from DLMS .xml • Nearly doubled the capability of what we first set out to accomplish • 82 Transactions vs. the 42 transactions that were listed on proposal • Minimizes custom development and maximizes configurability • Data mappings are in files that are checked in/checked out • Controls conversion to DLMS by transaction and destination system • Provides easily managed multiple on/off switches by management of a RID/DoDAAC Conversion Table • DAAS Reject Management-query by selection criteria, edit and reprocess transactions back to DAAS • ES-S Audit Trail Component – records conversion and stores all data fields

  13. Schedule * Pending schedule change (ES-S Ver 2.0 Patch /AF System Security Certifications)

  14. ILS-S in the Combat Support Tail Aircrew Equipment Avionics Components Airframe Components ECM Engine Components Munitions Components Base Level Infrastructure, Supplies and Support Equipment YOU CAN’T FLY WITHOUT SUPPLY

More Related