1 / 20

National Air Quality Conference Continuous PM2.5 Monitoring Issues BAM-1020 P ractical Advice for Best Performance

National Air Quality Conference Continuous PM2.5 Monitoring Issues BAM-1020 P ractical Advice for Best Performance . California Air Resources Board Mac McDougall. Beta Attenuation Mass Monitor. PMT C14 source nozzle/vane filter tape tape transport smart heater met translator actual flow

noam
Télécharger la présentation

National Air Quality Conference Continuous PM2.5 Monitoring Issues BAM-1020 P ractical Advice for Best Performance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Air Quality ConferenceContinuous PM2.5 Monitoring IssuesBAM-1020 Practical Advice for Best Performance California Air Resources Board Mac McDougall

  2. Beta Attenuation Mass Monitor PMT C14 source nozzle/vane filter tape tape transport smart heater met translator actual flow GAST pump SSI

  3. Basics - Sampling/Monitoring • Purpose/Interest • You get out what you put in • Principle of Operation - understanding • Expectations - specifications • ATP/SOP – document & follow through • Quality Assurance & maintenance • Evaluation - troubleshooting • Data validation – remove bad data • Responsible final review

  4. BAM-1020 Network Development • How equipment works – Investigate • Bench test criteria – Develop (i.e. zero test) • Write Acceptance Test Procedure (ATP) • Bench test every monitor (no exceptions) • Write Standard Operating Procedure (SOP) • Rigid field install/config./evaluation • BAM-1020 data review/validation

  5. FRM & Continuous Placement • Collocate • Height

  6. Grounding • tube to inlet • inlet to case • case to ground

  7. Inlets • ID fit • o-rings • clean

  8. Filter Tape Hole Punching • inspect w/ each visit • inspect w/ tape change • clean nozzle/vane

  9. BAM-1020 Pump • Medo pump • quiet • easy rebuild • GAST pump • less expensive • not much louder • improved flow (loading) • improved leak check • longer life • Better flow @ altitudes

  10. Zero Test and Criteria • HEPA filter kit (0.2 um) • Background set to 0.000 • BAM-1020 warm up • Leak check & calibrate • Remove first 4 hours • Consecutive 72 valid hours • Max/Min </= 14 ug/m3 • No value exceed 20 ug/m3 • No -5 ug/m3 values • Any errors, rerun test • Field test when first installed • *Field test every 12 or 24 months

  11. Zero Test ResultsMax = 6ug/m3 Min = -3 ug/m3 Average/Bkgd = 0

  12. Data Validation • Download BAM-1020 Data • 900 values (915/995 ug/m3) • Qtot (0.830-0.837 m3) • Error codes (understand & evaluate) • Error log • Configuration file changes • External data logger offset • Invalidate • Responsible data review • *Overall concentration pattern

  13. Typical BAM-1020 Data • 01/01/08 01:00, 0.041, 0.833, 0.9, 74.9, 23.3, 148, 29.0, 3.2, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 02:00, 0.038, 0.833, 1.6, 36.7, 23.3, 148, 29.0, 3.2, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 03:00, 0.043, 0.833, 0.6, 215.2, 23.4, 146, 29.0, 2.6, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 04:00, 0.036, 0.833, 1.3, 7.7, 23.4, 145, 28.9, 2.3, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 05:00, 0.047, 0.833, 2.9, 2.9, 23.3, 147, 29.0, 3.1, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 06:00, 0.026, 0.834, 2.0, 237.1, 23.2, 147, 29.0, 3.2, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 07:00, 0.025, 0.833, 1.5, 201.8, 23.4, 146, 29.0, 2.4, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 08:00, 0.026, 0.834, 2.1, 207.9, 23.4, 143, 28.9, 1.7, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 09:00, 0.011, 0.834, 4.6, 231.0, 23.5, 150, 29.0, 3.5, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 10:00, 0.021, 0.833, 4.4, 231.9, 23.5, 153, 29.1, 5.6, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 11:00, 0.018, 0.834, 4.6, 210.8, 23.5, 148, 29.1, 7.6, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 12:00, 0.010, 0.833, 4.6, 215.8, 23.5, 147, 29.2, 9.6, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 13:00, 0.010, 0.834, 5.8, 233.4, 23.4, 146, 29.3, 11.1, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 14:00, 0.007, 0.834, 5.1, 232.1, 23.3, 144, 29.3, 12.1, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 15:00, 0.005, 0.834, 4.3, 236.5, 23.1, 145, 29.3, 12.7, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 16:00, 0.006, 0.834, 3.8, 235.8, 23.0, 145, 29.3, 11.9, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 17:00, 0.008, 0.833, 3.5, 239.3, 22.9, 147, 29.3, 10.9, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 18:00, 0.012, 0.834, 3.1, 236.9, 22.9, 150, 29.2, 9.9, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 19:00, 0.016, 0.834, 2.3, 225.3, 22.9, 149, 29.2, 9.3, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 20:00, 0.009, 0.834, 2.3, 227.3, 23.0, 148, 29.2, 8.7, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 21:00, 0.015, 0.834, 1.9, 216.7, 23.0, 147, 29.1, 7.7, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 22:00, 0.012, 0.834, 2.4, 7.3, 23.1, 146, 29.1, 7.6, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/01/08 23:00, 0.009, 0.833, 2.1, 44.2, 23.2, 147, 29.1, 6.4, 0,0,0,0,0,0,0,0,0,0,0,0,

  14. Quality Control • Flow check • 16.7 LPM +/- 4% • Leak check • Met One </= 1.00 LPM • CARB <1.00 LPM • Ideal </= 0.4 LPM • If either check fails, invalidate data

  15. BAM-1020 Data With Code • 01/11/08 11:00, 0.023, 0.833, 5.0, 190.1, 22.3, 173, 29.2, 9.8, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 12:00, 0.015, 0.834, 4.5, 198.7, 22.3, 171, 29.2, 10.0, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 13:00, 0.017, 0.834, 4.2, 225.7, 22.3, 169, 29.3, 10.4, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 14:00, 0.010, 0.834, 3.9, 209.7, 22.3, 168, 29.3, 10.9, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 15:00, 0.995, 0.000, 4.6, 198.5, 22.4, 167, 29.3, 11.0, 0,0,1,0,0,0,0,0,0,0,0,0, • 01/11/08 16:00, 0.006, 0.836, 4.2, 202.2, 22.3, 164, 29.3, 11.2, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 17:00, 0.005, 0.834, 4.3, 204.2, 22.3, 168, 29.3, 10.7, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 18:00, 0.005, 0.834, 4.0, 205.3, 22.2, 166, 29.3, 10.4, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 19:00, 0.005, 0.834, 4.2, 208.8, 22.2, 167, 29.2, 10.1, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 20:00, 0.004, 0.834, 3.7, 219.6, 22.3, 167, 29.2, 9.9, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 21:00, 0.003, 0.833, 4.2, 206.8, 22.3, 168, 29.2, 9.7, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 22:00, 0.005, 0.834, 2.9, 200.2, 22.3, 169, 29.2, 9.6, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/11/08 23:00, 0.006, 0.833, 2.4, 175.8, 22.3, 168, 29.2, 9.5, 0,0,0,0,0,0,0,0,0,0,0,0, • 01/12/08 00:00, 0.009, 0.834, 2.6, 131.6, 22.3, 169, 29.2, 9.3, 0,0,0,0,0,0,0,0,0,0,0,0,

  16. Things To Do • Is your BAM-1020 up to date (all upgrades) • Talk directly to Met One • Develop an ATP w/ criteria • Develop SOP w/ QC • Site/install appropriately • Evaluate network • Troubleshoot and remedy • Validate and review

  17. Current Network – What Next • Maintain current BAM-1020 network • BAM-1020 mainly used for: • PM-AQI • Ag-Burn Forecasting • Special studies • Evaluate FEM BAM-1020 Monitor • Potential FEM BAM-1020 network upgrade

  18. Time Series (24 Hour Averages)

  19. Data Integrity THE PRICE OF QUALITY DATA IS CONSTANT VIGILANCE

  20. Contact Information • Mac McDougall • 916-327-4720 • emcdouga@arb.ca.gov

More Related