260 likes | 389 Vues
On-line Multi-criteria Allocating System of Emergent Patients. Chao-Wen Chen, Ting-Wei Shiu, Yuh-Wen Chen. 1. Introduction. A large disaster always generates numerous trauma patients in a very short time.
E N D
On-line Multi-criteria Allocating System of Emergent Patients Chao-Wen Chen,Ting-Wei Shiu, Yuh-Wen Chen
1. Introduction • A large disaster always generates numerous trauma patients in a very short time. • How to allocate these patients to appropriate hospitals for saving lives is an important issue. • We expect to design an allocation system for emergent patients by matching the supply side: hospitals and demand side: patient characteristics via internet. • This study proposes an multi-criteria allocation model for assigning emergent patients.
2. System Framework and Model • System • RFID • Affinity Set • TTAS • RTS
RFID/Demonstration 2006-2011 2000-2005
Affinity Set • Aset developed to deal the interaction of elements. • Affinity is a neutral term. • Many affinities could be found in practices: • Political party • Conference participants • …
Indirect Affinity • As mentioned earlier, a close relationship between people or things that have similar qualities, structures, properties or features etc. we call this type of affinity indirect affinity. • Direct Affinity • Direct affinity is natural liking for or attraction to a person or a thing or an idea, etc. In direct affinity two elements are involved: the subjects of affinity and the affinity that takes place between them.
TTAS • Taiwan Triage and Acuity Scale, TTAS • Based on the basis of Canadian Triage and Acuity Scale, CTAS
RTS • Revised Trauma Score • A weighting combination of Glasgow Coma Scale (GCS), Systolic Blood Pressure (SBP), and Respiratory Rate (RR).
Allocation Model • We use a network model based on affinity set to represent the decision process of allocating patients. • Maximizing the global affinity is to be achieved. • TTAS and RTS are obtained from the on-line trauma registry system. • The capability of each hospital and the vital signs/characteristics (TTAS, RTS) of each patient are simultaneously considered for matching. • Simulation results are visualized for each hospital.
3. The Model and Example • Find the hospital that maximizing the global affinity • Constrained to the decision process/flow chart • Considered criteria: • Supply side: number of doctors on call (C1), special life support (C2), number of available beds (C3), rank of hospital (C4), distance to hospital (C5), number of specialty doctor (C6) • Demand side: TTAS, RTS
4. Conclusions and Recommendations • This is an interesting study for on-line MCDM. • The matching process for the supply side and demand side still needs sophisticated improvements. • Based on the registry system via internet, the value-added services of this study could be practically launched soon. • Cloud computing for assigning tremendous patients after a large disaster is possible in the very near future.