1 / 5

Production

Production. Yield. Acceptance criteria. Test. PS & SPD LHCb Calo PRR – March 2004 – CERN. I. Yield. According to these results yield is about 85 %. II. Acceptance criteria (I). Possible scenario (using PMT load resistors of 470 ) :

noreen
Télécharger la présentation

Production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production • Yield. • Acceptance criteria. • Test. PS & SPD LHCb Calo PRR – March2004 –CERN

  2. I. Yield. • According to these results yield is about 85 %.

  3. II. Acceptance criteria (I). • Possible scenario (using PMT load resistors of 470): • Signal 0 – 25 ns about 76 % and tail 25 – 50 ns about 22 % • MIP signal 0 – 25 ns between 83 and 21 mV for PMT uniformity factor of 4 (gain is 1.1 mV/fC). • Noise 2 mV r.m.s. • SNR for MIP signal is between 40 and 10. • Resolution is given by the LSB of the internal DAC, LSB=3.2 mV seems to be enough to cover the offsets of about the 95% of the chips. • Resolution between 4 % and 16 %. • SNR can be increased if needed with larger PMT load resistors. • It is possible to compensate the PMT gain non-uniformities and the ASIC offsets tuning the input resistors. Offset: µ = -70  = 55 DAC: Offset = 0 LSB = 4 Units are in mV 143 µ+2.5 = 60 µ-2.5 = -200 1 MIP 83 max. - 63 LSB= -200 63 LSB= 200

  4. II. Acceptance criteria (II). • Defects are found in about 15% of the chips. • No special rejection criteria on offset is needed. • No rejection criteria on linearity or pile-up correction seems to be needed since all the chips that have been tested are within requirements. • A yield >80% is assumed • To equip 100 boards, 800 chips are needed. • To keep 20% of spare chips, a production of 1250 units is required

  5. III. Test. • The following points should be included in the test of the complete production: • Offset • Gain • Pile-up correction • Digital interface • A new VHDL code is under development to accelerate the test (it will include threshold scan algotiyhms).

More Related